Astronics (ATRO) Construction in Progress (2016 - 2017)
Historic Construction in Progress for Astronics (ATRO) over the last 8 years, with Q4 2017 value amounting to $9.8 million.
- Astronics' Construction in Progress rose 1929.85% to $9.8 million in Q4 2017 from the same period last year, while for Dec 2017 it was $9.8 million, marking a year-over-year increase of 1929.85%. This contributed to the annual value of $9.8 million for FY2017, which is 1929.85% up from last year.
- According to the latest figures from Q4 2017, Astronics' Construction in Progress is $9.8 million, which was up 1929.85% from $8.2 million recorded in Q4 2016.
- In the past 5 years, Astronics' Construction in Progress registered a high of $9.8 million during Q4 2017, and its lowest value of $1.5 million during Q4 2013.
- For the 5-year period, Astronics' Construction in Progress averaged around $5.5 million, with its median value being $4.8 million (2014).
- As far as peak fluctuations go, Astronics' Construction in Progress surged by 21152.59% in 2014, and later plummeted by 3100.69% in 2015.
- Over the past 5 years, Astronics' Construction in Progress (Quarter) stood at $1.5 million in 2013, then surged by 211.53% to $4.8 million in 2014, then tumbled by 31.01% to $3.3 million in 2015, then soared by 149.3% to $8.2 million in 2016, then rose by 19.3% to $9.8 million in 2017.
- Its last three reported values are $9.8 million in Q4 2017, $8.2 million for Q4 2016, and $3.3 million during Q4 2015.