Growth Metrics

Asml Holding (ASML) Construction in Progress: 2009-2024

Historic Construction in Progress for Asml Holding (ASML) over the last 16 years, with FY2024 value amounting to $1.8 billion.

  • Asml Holding's Construction in Progress rose 361.23% to $1.8 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $1.8 billion, marking a year-over-year increase of 361.23%. This contributed to the annual value of $1.8 billion for FY2024, which is 361.23% up from last year.
  • Asml Holding's Construction in Progress amounted to $1.8 billion in FY2024, which was up 361.23% from $1.8 billion recorded in FY2023.
  • In the past 5 years, Asml Holding's Construction in Progress ranged from a high of $1.8 billion in FY2024 and a low of $796.1 million during FY2021
  • For the 5-year period, Asml Holding's Construction in Progress averaged around $1.2 billion, with its median value being $887.4 million (2022).
  • In the last 5 years, Asml Holding's Construction in Progress skyrocketed by 15125.76% in 2020 and then plummeted by 128.65% in 2021.
  • Asml Holding's Construction in Progress (Annual) stood at $806.5 million in 2020, then dropped by 1.29% to $796.1 million in 2021, then increased by 11.47% to $887.4 million in 2022, then surged by 101.02% to $1.8 billion in 2023, then rose by 3.61% to $1.8 billion in 2024.
  • Its Construction in Progress was $1.8 billion in FY2024, compared to $1.8 billion in FY2023 and $887.4 million in FY2022.