Growth Metrics

Ankam (ANKM) Construction in Progress (2022 - 2023)

Historic Construction in Progress for Ankam (ANKM) over the last 2 years, with Q3 2023 value amounting to $198710.0.

  • Ankam's Construction in Progress changed N/A to $198710.0 in Q3 2023 from the same period last year, while for Aug 2023 it was $198710.0, marking a year-over-year change of. This contributed to the annual value of $198710.0 for FY2022, which is N/A changed from last year.
  • Ankam's Construction in Progress amounted to $198710.0 in Q3 2023.
  • Ankam's Construction in Progress' 5-year high stood at $198710.0 during Q4 2022, with a 5-year trough of $198710.0 in Q4 2022.