American Tower (AMT) Construction in Progress (2016 - 2019)
Historic Construction in Progress for American Tower (AMT) over the last 11 years, with Q3 2019 value amounting to $378.7 million.
- American Tower's Construction in Progress changed N/A to $378.7 million in Q3 2019 from the same period last year, while for Sep 2019 it was $378.7 million, marking a year-over-year change of. This contributed to the annual value of $358.1 million for FY2018, which is 2694.08% up from last year.
- Per American Tower's latest filing, its Construction in Progress stood at $378.7 million for Q3 2019.
- American Tower's Construction in Progress' 5-year high stood at $390.2 million during Q2 2019, with a 5-year trough of $203.4 million in Q4 2016.
- For the 5-year period, American Tower's Construction in Progress averaged around $316.6 million, with its median value being $358.1 million (2018).
- Its Construction in Progress has fluctuated over the past 5 years, first crashed by 1488.12% in 2016, then skyrocketed by 3869.22% in 2017.
- Quarter analysis of 5 years shows American Tower's Construction in Progress stood at $239.0 million in 2015, then decreased by 14.88% to $203.4 million in 2016, then skyrocketed by 38.69% to $282.1 million in 2017, then grew by 26.94% to $358.1 million in 2018, then increased by 5.75% to $378.7 million in 2019.
- Its Construction in Progress was $378.7 million in Q3 2019, compared to $390.2 million in Q2 2019 and $364.8 million in Q1 2019.