KPIs & Operating Metrics(New)
Growth Metrics

American Tower (AMT) Construction in Progress (2016 - 2019)

American Tower (AMT) has disclosed Construction in Progress for 11 consecutive years, with $378.7 million as the latest value for Q3 2019.

  • Quarterly Construction in Progress changed N/A to $378.7 million in Q3 2019 from the year-ago period, while the trailing twelve-month figure was $378.7 million through Sep 2019, changed N/A year-over-year, with the annual reading at $358.1 million for FY2018, 26.94% up from the prior year.
  • Construction in Progress hit $378.7 million in Q3 2019 for American Tower, down from $390.2 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $390.2 million in Q2 2019 to a low of $203.4 million in Q4 2016.
  • Historically, Construction in Progress has averaged $316.6 million across 5 years, with a median of $358.1 million in 2018.
  • Biggest five-year swings in Construction in Progress: fell 14.88% in 2016 and later skyrocketed 38.69% in 2017.
  • Year by year, Construction in Progress stood at $239.0 million in 2015, then dropped by 14.88% to $203.4 million in 2016, then surged by 38.69% to $282.1 million in 2017, then grew by 26.94% to $358.1 million in 2018, then rose by 5.75% to $378.7 million in 2019.
  • Business Quant data shows Construction in Progress for AMT at $378.7 million in Q3 2019, $390.2 million in Q2 2019, and $364.8 million in Q1 2019.