KPIs & Operating Metrics(New)
Growth Metrics

American Tower (AMT) Construction in Progress (2016 - 2019)

American Tower's Construction in Progress history spans 11 years, with the latest figure at $378.7 million for Q3 2019.

  • For Q3 2019, Construction in Progress changed N/A year-over-year to $378.7 million; the TTM value through Sep 2019 reached $378.7 million, changed N/A, while the annual FY2018 figure was $358.1 million, 26.94% up from the prior year.
  • Construction in Progress for Q3 2019 was $378.7 million at American Tower, down from $390.2 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $390.2 million in Q2 2019 and bottomed at $203.4 million in Q4 2016.
  • The 5-year median for Construction in Progress is $358.1 million (2018), against an average of $316.6 million.
  • The largest annual shift saw Construction in Progress decreased 14.88% in 2016 before it soared 38.69% in 2017.
  • A 5-year view of Construction in Progress shows it stood at $239.0 million in 2015, then fell by 14.88% to $203.4 million in 2016, then skyrocketed by 38.69% to $282.1 million in 2017, then rose by 26.94% to $358.1 million in 2018, then increased by 5.75% to $378.7 million in 2019.
  • Per Business Quant, the three most recent readings for AMT's Construction in Progress are $378.7 million (Q3 2019), $390.2 million (Q2 2019), and $364.8 million (Q1 2019).