Growth Metrics

Array Digital Infrastructure (AD) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Array Digital Infrastructure (AD) over the last 15 years, with Q4 2024 value amounting to $174.0 million.

  • Array Digital Infrastructure's Construction in Progress rose 419.16% to $174.0 million in Q4 2024 from the same period last year, while for Dec 2024 it was $174.0 million, marking a year-over-year increase of 419.16%. This contributed to the annual value of $174.0 million for FY2024, which is 419.16% up from last year.
  • Per Array Digital Infrastructure's latest filing, its Construction in Progress stood at $174.0 million for Q4 2024, which was up 419.16% from $167.0 million recorded in Q4 2023.
  • Array Digital Infrastructure's 5-year Construction in Progress high stood at $317.0 million for Q4 2020, and its period low was $167.0 million during Q4 2023.
  • Over the past 5 years, Array Digital Infrastructure's median Construction in Progress value was $218.0 million (recorded in 2022), while the average stood at $227.4 million.
  • As far as peak fluctuations go, Array Digital Infrastructure's Construction in Progress tumbled by 2339.45% in 2023, and later skyrocketed by 419.16% in 2024.
  • Over the past 5 years, Array Digital Infrastructure's Construction in Progress (Quarter) stood at $317.0 million in 2020, then decreased by 17.67% to $261.0 million in 2021, then decreased by 16.48% to $218.0 million in 2022, then fell by 23.39% to $167.0 million in 2023, then rose by 4.19% to $174.0 million in 2024.
  • Its Construction in Progress stands at $174.0 million for Q4 2024, versus $167.0 million for Q4 2023 and $218.0 million for Q4 2022.