American Shared Hospital Services (AMS) Construction in Progress (2016 - 2022)
American Shared Hospital Services has reported Construction in Progress over the past 8 years, most recently at $88000.0 for Q1 2022.
- Quarterly results put Construction in Progress at $88000.0 for Q1 2022, down 92.53% from a year ago — trailing twelve months through Mar 2022 was $88000.0 (down 92.53% YoY), and the annual figure for FY2021 was $91000.0, down 46.47%.
- Construction in Progress for Q1 2022 was $88000.0 at American Shared Hospital Services, down from $91000.0 in the prior quarter.
- Over the last five years, Construction in Progress for AMS hit a ceiling of $3.8 million in Q4 2018 and a floor of $86000.0 in Q3 2021.
- Median Construction in Progress over the past 5 years was $149000.0 (2020), compared with a mean of $942250.0.
- Biggest five-year swings in Construction in Progress: skyrocketed 131.12% in 2018 and later tumbled 92.53% in 2022.
- American Shared Hospital Services' Construction in Progress stood at $3.8 million in 2018, then tumbled by 48.72% to $2.0 million in 2019, then tumbled by 91.35% to $170000.0 in 2020, then plummeted by 46.47% to $91000.0 in 2021, then decreased by 3.3% to $88000.0 in 2022.
- The last three reported values for Construction in Progress were $88000.0 (Q1 2022), $91000.0 (Q4 2021), and $86000.0 (Q3 2021) per Business Quant data.