Ardagh Metal Packaging (AMBP) Construction in Progress (2020 - 2025)
Ardagh Metal Packaging (AMBP) has disclosed Construction in Progress for 6 consecutive years, with $254.0 million as the latest value for Q4 2025.
- On a quarterly basis, Construction in Progress rose 4.1% to $254.0 million in Q4 2025 year-over-year; TTM through Dec 2025 was $254.0 million, a 4.1% increase, with the full-year FY2025 number at $254.0 million, up 4.1% from a year prior.
- Construction in Progress was $254.0 million for Q4 2025 at Ardagh Metal Packaging, up from $244.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $634.0 million in Q4 2021 to a low of $244.0 million in Q4 2024.
- A 5-year average of $442.0 million and a median of $447.0 million in 2023 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: soared 186.88% in 2021, then crashed 45.41% in 2024.
- Ardagh Metal Packaging's Construction in Progress stood at $634.0 million in 2021, then fell by 0.47% to $631.0 million in 2022, then decreased by 29.16% to $447.0 million in 2023, then plummeted by 45.41% to $244.0 million in 2024, then rose by 4.1% to $254.0 million in 2025.
- Per Business Quant, the three most recent readings for AMBP's Construction in Progress are $254.0 million (Q4 2025), $244.0 million (Q4 2024), and $447.0 million (Q4 2023).