Ardagh Metal Packaging (AMBP) Construction in Progress (2020 - 2025)
Ardagh Metal Packaging (AMBP) has disclosed Construction in Progress for 6 consecutive years, with $254.0 million as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 4.1% to $254.0 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $254.0 million through Dec 2025, up 4.1% year-over-year, with the annual reading at $254.0 million for FY2025, 4.1% up from the prior year.
- Construction in Progress for Q4 2025 was $254.0 million at Ardagh Metal Packaging, up from $244.0 million in the prior quarter.
- The five-year high for Construction in Progress was $634.0 million in Q4 2021, with the low at $244.0 million in Q4 2024.
- Average Construction in Progress over 5 years is $442.0 million, with a median of $447.0 million recorded in 2023.
- The sharpest move saw Construction in Progress skyrocketed 186.88% in 2021, then plummeted 45.41% in 2024.
- Over 5 years, Construction in Progress stood at $634.0 million in 2021, then dropped by 0.47% to $631.0 million in 2022, then fell by 29.16% to $447.0 million in 2023, then tumbled by 45.41% to $244.0 million in 2024, then grew by 4.1% to $254.0 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $254.0 million, $244.0 million, and $447.0 million for Q4 2025, Q4 2024, and Q4 2023 respectively.