Albemarle (ALB-PA) Construction in Progress (2016 - 2025)
Historic Construction in Progress for Albemarle (ALB-PA) over the last 16 years, with Q4 2025 value amounting to $642.9 million.
- Albemarle's Construction in Progress fell 3631.82% to $642.9 million in Q4 2025 from the same period last year, while for Dec 2025 it was $642.9 million, marking a year-over-year decrease of 3631.82%. This contributed to the annual value of $642.9 million for FY2025, which is 3631.82% down from last year.
- Albemarle's Construction in Progress amounted to $642.9 million in Q4 2025, which was down 3631.82% from $1.0 billion recorded in Q4 2024.
- Albemarle's 5-year Construction in Progress high stood at $3.1 billion for Q4 2023, and its period low was $642.9 million during Q4 2025.
- Its 5-year average for Construction in Progress is $1.8 billion, with a median of $2.1 billion in 2021.
- Its Construction in Progress has fluctuated over the past 5 years, first skyrocketed by 3795.8% in 2021, then plummeted by 6698.78% in 2024.
- Albemarle's Construction in Progress (Quarter) stood at $2.1 billion in 2021, then increased by 9.17% to $2.2 billion in 2022, then skyrocketed by 36.16% to $3.1 billion in 2023, then tumbled by 66.99% to $1.0 billion in 2024, then crashed by 36.32% to $642.9 million in 2025.
- Its last three reported values are $642.9 million in Q4 2025, $1.0 billion for Q4 2024, and $3.1 billion during Q4 2023.