Chemical & Mining Co Of Chile (SQM) Construction in Progress (2016 - 2025)

Chemical & Mining Co Of Chile has reported Construction in Progress over the past 10 years, most recently at $2.5 billion for Q4 2025.

  • Quarterly Construction in Progress rose 26.63% to $2.5 billion in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $2.5 billion through Dec 2025, up 26.63% year-over-year, with the annual reading at $2.5 billion for FY2025, 26.63% up from the prior year.
  • Construction in Progress was $2.5 billion for Q4 2025 at Chemical & Mining Co Of Chile, up from $2.0 billion in the prior quarter.
  • Over five years, Construction in Progress peaked at $2.5 billion in Q4 2025 and troughed at $14.8 million in Q4 2023.
  • The 5-year median for Construction in Progress is $1.3 billion (2022), against an average of $1.3 billion.
  • Biggest five-year swings in Construction in Progress: crashed 98.89% in 2023 and later surged 13135.46% in 2024.
  • Tracing SQM's Construction in Progress over 5 years: stood at $731.8 million in 2021, then soared by 81.54% to $1.3 billion in 2022, then crashed by 98.89% to $14.8 million in 2023, then surged by 13135.46% to $2.0 billion in 2024, then increased by 26.63% to $2.5 billion in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $2.5 billion, $2.0 billion, and $14.8 million for Q4 2025, Q4 2024, and Q4 2023 respectively.