Growth Metrics

Aehr Test Systems (AEHR) Construction in Progress: 2024-2025

Historic Construction in Progress for Aehr Test Systems (AEHR) over the last 2 years, with FY2025 value amounting to $362000.0.

  • Aehr Test Systems' Construction in Progress changed N/A to $888000.0 in Q4 2025 from the same period last year, while for Nov 2025 it was $888000.0, marking a year-over-year change of. This contributed to the annual value of $362000.0 for FY2025, which is 4326.02% down from last year.
  • Per Aehr Test Systems' latest filing, its Construction in Progress stood at $362000.0 for FY2025, which was down 4326.02% from $638000.0 recorded in FY2024.
  • Aehr Test Systems' Construction in Progress' 5-year high stood at $638000.0 during FY2024, with a 5-year trough of $362000.0 in FY2025.