Applied Optoelectronics (AAOI) Construction in Progress (2016 - 2019)
Applied Optoelectronics (AAOI) has disclosed Construction in Progress for 7 consecutive years, with $23.9 million as the latest value for Q3 2019.
- Quarterly Construction in Progress rose 28.95% to $23.9 million in Q3 2019 from the year-ago period, while the trailing twelve-month figure was $23.9 million through Sep 2019, up 28.95% year-over-year, with the annual reading at $16.4 million for FY2018, 241.05% up from the prior year.
- Construction in Progress for Q3 2019 was $23.9 million at Applied Optoelectronics, up from $20.0 million in the prior quarter.
- The five-year high for Construction in Progress was $28.8 million in Q1 2016, with the low at $1.1 million in Q3 2016.
- Average Construction in Progress over 5 years is $11.8 million, with a median of $10.1 million recorded in 2017.
- The sharpest move saw Construction in Progress plummeted 91.58% in 2016, then soared 543.77% in 2017.
- Over 5 years, Construction in Progress stood at $21.2 million in 2015, then plummeted by 90.63% to $2.0 million in 2016, then surged by 142.48% to $4.8 million in 2017, then skyrocketed by 241.05% to $16.4 million in 2018, then soared by 45.15% to $23.9 million in 2019.
- According to Business Quant data, Construction in Progress over the past three periods came in at $23.9 million, $20.0 million, and $17.6 million for Q3 2019, Q2 2019, and Q1 2019 respectively.