Applied Optoelectronics (AAOI) Construction in Progress (2016 - 2019)
Applied Optoelectronics (AAOI) has disclosed Construction in Progress for 7 consecutive years, with $23.9 million as the latest value for Q3 2019.
- On a quarterly basis, Construction in Progress rose 28.95% to $23.9 million in Q3 2019 year-over-year; TTM through Sep 2019 was $23.9 million, a 28.95% increase, with the full-year FY2018 number at $16.4 million, up 241.05% from a year prior.
- Construction in Progress was $23.9 million for Q3 2019 at Applied Optoelectronics, up from $20.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $28.8 million in Q1 2016 to a low of $1.1 million in Q3 2016.
- A 5-year average of $11.8 million and a median of $10.1 million in 2017 define the central range for Construction in Progress.
- Peak YoY movement for Construction in Progress: crashed 91.58% in 2016, then surged 543.77% in 2017.
- Applied Optoelectronics' Construction in Progress stood at $21.2 million in 2015, then crashed by 90.63% to $2.0 million in 2016, then skyrocketed by 142.48% to $4.8 million in 2017, then soared by 241.05% to $16.4 million in 2018, then surged by 45.15% to $23.9 million in 2019.
- Per Business Quant, the three most recent readings for AAOI's Construction in Progress are $23.9 million (Q3 2019), $20.0 million (Q2 2019), and $17.6 million (Q1 2019).