Perma-Fix Environmental Services PESI

NASDAQ PESI
$12.49 -0.18 (-1.42%)
At close: Nov 27, 2026 · 4:00 PM EST
Key Stats
Market Cap265.03 Mn
Enterprise Value238.52 Mn
Revenue (Yr)61.67 Mn
P/E-11.62
P/FCF-19.38
EV to EBIT-11.42
Net Income (Yr)-13.78 Bn
FCF (Yr)-15.46 Mn
EPS (Diluted) (TTM)-1.07
Revenue Growth (1y) (Yr)4.33%
Net Margin (Yr)-22.35%
ROA (Yr)-14,878.94%
Add ratio to table…

About

Perma-Fix Environmental Services, Inc. is a nuclear services company and a leading provider of nuclear and mixed waste management services. The firm treats and manages radioactive and mixed waste, which includes hazardous materials combined with low level radioactive waste. Its nuclear services group offers project management, environmental restoration, decontamination and decommissioning, new build construction, and radiological protection, safety, and industrial hygiene…

Read more ↓
Sector: Industrials Sector rationale The company provides environmental services, specifically the treatment, processing, and disposal of nuclear and hazardous waste, as well as technical consulting and decontamination services. These activities fall under 'Environmental Services' and 'Hazardous Waste' within the Industrials sector, serving business and government customers like the U.S. Department of Energy. Industries: Hazardous Waste Hazardous Waste Primary Perma-Fix operates four licensed facilities for the processing, storage, and disposal of nuclear, low-level radioactive, mixed, and hazardous waste. Its Treatment Segment earns fees specifically for handling these regulated waste streams for customers like the U.S. Department of Energy. Environmental Services Environmental Services Secondary The company's Services Segment provides technical consulting, radiological measurements, health physics, and environmental restoration services. These activities constitute environmental engineering and regulatory compliance support sold as professional services. Classified using BQ-MICS CIK: 0000891532
Bull & bear

Investment Thesis

▲ Bull case
  • Hanford DFLAW effluent ramp and IDIQ position

    Perma-Fix Northwest began receiving liquid effluent from the DFLAW facility in July 2026 and is grouting it today, with monthly volumes projected to double from 8,000 to 16,000 gallons by October and management citing a potential path to 40,000 gallons per month as DFLAW approaches full capacity in 2028. The August 2026 award of one of three Master IDIQ subcontracts from H2C, with a shared ceiling of 50 million gallons and $4.4 billion in value through 2041, locks in the contractual vehicle for this waste. Because Perma-Fix Northwest is the only subcontract holder with a permitted facility adjacent to the Hanford site, it can grout and stabilize waste in Richland and ship solidified product by rail, while the other two awardees must transport liquid waste in smaller highway loads to their own disposal sites, giving Perma-Fix a structural cost and logistics advantage that should capture a disproportionate share of task orders as DFLAW production scales. The first task order under the IDIQ is expected within weeks to support ongoing EMF effluent grouting, converting the backlog into visible revenue over the next year.

  • Pricing reform in Treatment segment

    After years of rising labor, technology, and equipment replacement costs, Perma-Fix implemented price increases across commercial and government waste streams starting in August 2026, with full deployment in October. Management noted that customers have been supportive of the changes and that new pricing is already reflected in the growing treatment backlog, which reached $19.6 million at quarter end, up 65% from year-end 2025. Because the increases apply to both existing and new waste streams, they should expand Treatment segment gross margins directly as the higher-priced backlog is processed, offsetting the fixed-cost absorption drag that depressed margins in the third quarter when facility costs rose $1.1 million year-over-year while revenue fell on protocol delays.

  • Thermal treatment upgrades completed and backlog conversion

    Scheduled maintenance and upgrades on thermal treatment systems at the Florida and Kingston, Tennessee facilities were completed in September 2026, removing a throughput bottleneck that constrained third-quarter revenue. The work was undertaken specifically to support a large backlog of waste receipts accumulated over the summer, and with systems now operational, the company can process that inventory in the fourth quarter and Q1 FY27. This converts deferred revenue into recognized revenue without additional capital outlay, and the restored thermal capacity also positions the Treatment segment to handle incremental volumes from Hanford dry waste streams and commercial PFAS destruction as they materialize.

  • Nuclear Services margin inflection and backlog visibility

    Nuclear Services revenue grew 46% year-over-year to $6.3 million in the third quarter, driven by projects awarded since January including the $24 million Master Task Agreement with Lawrence Livermore National Laboratory. Segment gross margin improved to 12.2% from 6.7% a year earlier, and the segment generated approximately $200,000 of operating income versus a $460,000 loss in the prior-year quarter. Monthly services revenue continued to grow through a steady flow of smaller awards, keeping staff highly utilized and supporting a backlog that extends through Q2 FY27. Critically, much of the services work involves waste retrieval that generates feedstock for Perma-Fix's own treatment facilities, creating an internal revenue loop that strengthens both segments simultaneously.

  • PFAS Gen 2.0 capacity tripling and regulatory tailwind

    The Gen 2.0 PFAS destruction system is primarily completed and entering commissioning in Q4 FY26, with full operation expected in the first half of 2027. Once deployed, it will triple PFAS processing capacity. Third-quarter sales and receipts already increased versus the first half of the year, driven by airport fire suppression system change-outs. Florida and other states have enacted legislation phasing out PFAS-containing firefighting foams over three years with civil penalties for non-compliance, creating a regulatory mandate that should accelerate demand for destruction services beginning in the coming quarters. With the expanded system coming online as state deadlines approach, Perma-Fix can capture volume that smaller or unpermitted competitors cannot handle.

▼ Bear case
  • East Area permit delays and AMPS dependency

    DOE submitted Class II and Class III permit modifications in August 2026 for grouting pretreated tank waste from the AP-106 tank, but the Washington State Department of Ecology responded on October 8 with incompleteness letters requesting additional information. While such letters are typical, the volume of requested data could push initial East Area waste receipts several months past DOE's original fourth-quarter 2026 target. Perma-Fix's ability to process this waste at scale also depends on DOE's Advanced Modular Pretreatment System (AMPS), which is not scheduled to be online until early 2028. Until AMPS operates, the pretreated waste volumes that would feed Perma-Fix's expanded grouting capacity remain theoretical, and any further permitting or construction delays at AMPS directly defer the East Area revenue opportunity.

  • West Area capacity expansion permitting risk

    Perma-Fix is advancing final design and procurement for facility upgrades to expand grouting permit capacity from 1.2 million gallons per year to levels supporting DOE's 200 West Area objectives, with completion expected in 2027 or late 2027 subject to regulatory approvals. The 200 West Area represents approximately 32 million gallons of tank waste from 22 tanks to be retrieved and grouted by 2040, and DOE has indicated a near-term preference for off-site commercial treatment. However, the permit modifications required from the Washington State Department of Ecology are not guaranteed on schedule, and any delay in approval would leave Perma-Fix unable to bid competitively on West Area task orders under the Master IDIQ, ceding volume to the other two subcontract holders who may have different permitting pathways or existing capacity elsewhere.

  • Continuing cash burn and going concern disclosure

    For the nine months ended September 2026, cash used by continuing operations was $10.8 million, driven by operating losses and working capital requirements, while investing activities consumed $6.0 million including $5.7 million in capital expenditures. The company's cash position of $14.7 million at quarter end is supported primarily by the $21.1 million net proceeds from the May 2026 equity offering, not by operating cash flow. Management acknowledged the going concern disclosure remains in place due to rigid accounting standards and lack of visibility on major customer timing, and while they expect to emerge from it, the company has not yet demonstrated sustained free cash flow generation. Another quarter of similar cash burn would reduce the runway to roughly six months without additional financing.

  • Hanford dry waste transition execution risk

    Dry waste receipts from DFLAW have been minimal to date because the construction and commissioning contractor Bechtel has not implemented a comprehensive waste management program, and Perma-Fix has no direct contract with Bechtel. The transition to operations contractor H2C is underway through April 2027, and only now is H2C implementing the profiling, shipping, and coordination needed for regular dry waste shipments. Management expects pickup in Q1 FY27, but the timeline depends entirely on H2C's transition execution, which is outside Perma-Fix's control. Additionally, most DFLAW-generated waste must be shipped within one year of generation, and with DFLAW operations starting in October 2025, a backlog of aged waste could create a compressed shipping window that strains Perma-Fix's receiving and processing capacity if shipments accelerate suddenly.

  • Treatment segment fixed cost structure and volume sensitivity

    Third-quarter Treatment segment gross profit declined $2.5 million year-over-year, with $1.1 million of the decline attributable to higher fixed facility costs from increased staffing, payroll, benefits, depreciation, maintenance, and other operating expenses. These fixed costs were incurred in anticipation of higher volumes that did not materialize due to customer-directed protocol delays and equipment downtime. The segment's variable costs already consume 34.5% of revenue, leaving limited margin cushion. If Hanford waste streams ramp more slowly than projected, or if commercial volumes soften, the elevated fixed cost base will continue to depress margins until volumes absorb it, creating a scenario where revenue growth is necessary just to maintain current profitability levels.

Geographical Breakdown of Revenue (2025)

History

Customer Breakdown of Revenue (2025)

History
Peer percentiles

How Perma-Fix Environmental Services ranks

Ranked against the 15 companies in Waste Management58 metrics · as of Nov 28, 2026

Valuation

12 metrics · Lower multiples rank higher; a negative multiple ranks last
  • P/ENegative earnings −11.6xMedian 41.3x 29th
  • P/FCFNegative free cash flow −19.4xMedian 29.9x 21st
  • P/Operating cash flowNegative operating cash flow −44.7xMedian 15.3x 25th
  • P/S 4.60xMedian 3.41x 36th
  • P/B 4.80xMedian 4.42x 46th
  • P/Tangible book 5.98xMedian 5.53x 46th
  • EV/EBITDANegative EBITDA −12.6xMedian 17.1x 27th
  • EV/EBITNegative EBIT −11.4xMedian 29.1x 33rd
  • EV/Revenue 4.14xMedian 3.82x 42nd
  • EV/FCFNegative free cash flow −17.4xMedian 35.6x 25th
  • EV/Operating cash flowNegative operating cash flow −40.2xMedian 17.6x 25th
  • PEG (3Y EPS CAGR)Negative earnings 0.09Median 2.53 Not meaningful —
Peer group

Peer Comparison

Companies in the Hazardous Waste
View all peers
S.No. Ticker Company Market CapP/EP/STotal Debt (Qtr)
1 WM Waste Management Inc 98.03 Bn119.9114.3223.37 Bn
2 RSG Republic Services, Inc. 77.15 Bn36.794.4814.06 Bn
3 WCN Waste Connections, Inc. 46.61 Bn41.304.699.45 Bn
4 GFL GFL Environmental Inc. 15.97 Bn-60.282.98-
5 CLH Clean Harbors Inc 15.58 Bn29.502.372.89 Bn
6 CWST Casella Waste Systems Inc 6.38 Bn-564.113.141.39 Bn
7 ONT Onterris, Inc. 0.79 Bn-74.821.050.32 Bn
8 PESI Perma Fix Environmental Services Inc 0.27 Bn-11.624.600.00 Bn