NANO Nuclear Energy NNE

NASDAQ NNE
$9.54 +0.69 (+7.80%)
At close: Nov 27, 2026 · 4:00 PM EST
Key Stats
Market Cap512.28 Mn
Enterprise Value213.21 Mn
Revenue (Yr)–
P/E-14.75
P/FCF-27.85
EV to EBIT-351.60
Net Income (Yr)-40.07 Mn
FCF (Yr)-28.07 Mn
EPS (Diluted) (TTM)-0.65
Revenue Growth (1y) (Yr)–
Net Margin (Yr)–
ROA (Yr)-35.05%
Add ratio to table…

About

Nano Nuclear Energy Inc. is a nuclear energy and technology company focused on developing advanced nuclear microreactors and building a domestic fuel supply chain. The company designs small modular reactors such as the KRONOS MMR™ Energy System the LOKI MMR™ reactor and the ZEUS™ reactor and works on high assay low enriched uranium fuel processing and transportation capabilities. The company intends to become a fully integrated supplier of clean energy by linking…

Read more ↓
Sectors: Energy Industrials Sector rationale The company's primary goal is to become an integrated supplier of clean energy, with long-term revenue derived from the sale of electricity and heat from its microreactors, as well as fuel processing and transportation of uranium. A secondary sector of Industrials is included because the company designs and manufactures capital equipment (the KRONOS, LOKI, and ZEUS reactors) and provides business-facing nuclear consulting services. Industries: Uranium Uranium Primary The company is building a domestic fuel supply chain for high assay low enriched uranium (HALEU), including conversion and fabrication capabilities through the DOE’s LEU Acquisition Program. This activity directly matches the production and fabrication of nuclear fuel described in E-13. Nuclear Equipment Nuclear Equipment Secondary The company designs and develops advanced nuclear microreactors, specifically the KRONOS MMR™ Energy System, the LOKI MMR™ reactor, and the ZEUS™ reactor. Consulting Consulting Secondary The company provides regulatory, technical, and strategic nuclear consulting services to clients such as Digihost. Classified using BQ-MICS CIK: 0001923891
Bull & bear

Investment Thesis

▲ Bull case
  • KRONOS MMR NRC Construction Permit Review Timeline

    The U.S. Nuclear Regulatory Commission formally accepted the KRONOS MMR Construction Permit Application in May 2026 and initiated its environmental and safety review the following month, projecting an environmental assessment completion in Spring 2027 and a safety evaluation by early Fall 2027. This schedule creates a visible pathway for initial construction activities at the University of Illinois Urbana-Champaign to begin in the second half of 2027, a milestone no other commercially focused U.S. microreactor program has reached. Achieving formal NRC review status converts regulatory uncertainty into a defined work plan, allowing engineering procurement and site preparation to proceed in parallel with the agency's evaluation. The University of Illinois host site provides a committed anchor customer and a licensed campus environment that de-risks early deployment logistics compared to greenfield commercial sites.

  • Fuel Handling Subsystem Engineering Maturity with Fortil

    Conceptual design of the KRONOS MMR Fuel Handling and Storage System is nearing conclusion under the Fortil collaboration, delivering a validated engineering approach, defined subsystem interfaces, and documentation that will guide preliminary design. Fortil's multidisciplinary nuclear team brings mechanical, systems, safety, and radiation protection expertise applied to a subsystem that is integral to reactor operations and licensing. Completing conceptual design before the NRC safety evaluation concludes means the license application can reference a more mature technical baseline, reducing the likelihood of requests for additional information that delay the docket. The transition to preliminary design also creates a template for standardized fuel handling across future commercial units, lowering per-unit engineering cost as the fleet scales.

  • Domestic HALEU Supply Framework with Quadrant Nuclear Industries

    A memorandum of understanding with Quadrant Nuclear Industries establishes a non-binding framework for long-term HALEU offtake from QNI's planned Vanguard facility at Idaho National Laboratory, which targets up to eighteen metric tons of annual production at full capacity. The agreement covers fuel supply planning, technical interface requirements, commercial structuring, regulatory coordination, logistics, and demand forecasting, aligning fuel availability with the KRONOS deployment timeline. Securing a domestic HALEU source mitigates the single largest supply chain risk for high-temperature gas-cooled microreactors, which cannot operate on standard low-enriched uranium. The collaboration also positions NANO Nuclear to influence fuel form and packaging specifications early, ensuring compatibility with the KRONOS core design and the company's patented transportation basket.

  • Manufacturing Readiness via IMPSA Pressure Vessel Expertise

    A three-year Engineering Services Master Agreement with IMPSA's U.S. subsidiary engages one of the few Latin American holders of ASME N and NPT stamps to perform design-for-manufacture assessment on the KRONOS reactor pressure vessel and other Class 1 components. IMPSA's four decades of nuclear pressure vessel fabrication under ASME Section III allows early identification of welding, inspection, and supply chain constraints before detailed design freezes. The initial six-month feasibility study targets fabrication accessibility, non-destructive examination limitations, and code-compliant calculations that feed directly into the NRC construction permit safety analysis. Embedding manufacturing reality into the licensing basis reduces the probability of costly redesign cycles after the construction permit is granted, preserving the projected second-half 2027 construction start.

  • Vertical Integration Through Nuclear Transportation and Fuel Subsidiaries

    Advanced Fuel Transportation, bolstered by the May 2026 acquisition of Secured Transportation Services, holds an exclusive license to a DOE-funded, national-lab-developed high-capacity HALEU transportation basket, creating a proprietary logistics capability for the fuel form KRONOS requires. Simultaneously, HALEU Energy Fuel Inc. is developing a domestic fuel fabrication pipeline for NANO Nuclear's own reactors and the broader advanced reactor market. Controlling both the transportation basket IP and the fuel fabrication intent captures margin at two critical choke points in the advanced nuclear value chain while guaranteeing priority access for the company's first deployments. The space-focused subsidiary NANO Nuclear Space adds a parallel revenue vector for the LOKI MMR technology without diverting KRONOS engineering resources.

▼ Bear case
  • Non-Binding HALEU MoU Lacks Commercial Commitments

    The Quadrant Nuclear Industries memorandum of understanding contains no firm offtake volumes, pricing mechanisms, or delivery dates, leaving KRONOS fuel supply entirely speculative until definitive agreements are executed. QNI's Vanguard facility at INL remains a planned facility with no stated construction start or licensing status, and its eighteen metric ton annual capacity target is an unproven design goal. If Vanguard faces the licensing and construction delays typical of first-of-a-kind nuclear fuel facilities, KRONOS deployments could be stranded without an alternative domestic HALEU source. The MoU's multi-year discussion framework acknowledges this timeline mismatch but offers no contractual remedy.

  • Construction Permit Review Schedule Carries Inherent NRC Uncertainty

    While the NRC has projected environmental assessment completion in Spring 2027 and safety evaluation by early Fall 2027, these are agency estimates subject to revision based on technical sufficiency findings, public comment volume, or resource constraints. The KRONOS MMR is the first commercially ready microreactor to enter formal construction permit review, meaning no precedent exists for the depth of technical questions the staff may raise on a high-temperature gas-cooled design at this scale. A single request for additional information on fuel qualification, graphite behavior, or passive safety analysis could extend the review beyond 2027, pushing the projected construction start into 2028 or later and consuming additional working capital.

  • Pre-Revenue Cost Structure Across Five Business Lines

    NANO Nuclear is simultaneously advancing three distinct reactor designs (KRONOS, ZEUS, LOKI), a nuclear fuel fabrication subsidiary (HEF), a transportation subsidiary (AFT/STS), a space subsidiary (NNS), and consulting services, all before any reactor has generated revenue. Each line carries dedicated engineering, regulatory, and overhead costs that compound the monthly burn rate. The May 2026 STS acquisition added integration risk and ongoing operating expenses to AFT. Without near-term contract revenue from consulting or transportation to offset reactor development spend, the company remains dependent on equity capital markets to fund the path to first revenue, exposing shareholders to dilution risk if capital access tightens.

  • Single University Anchor Site Limits Early Revenue Scaling

    The University of Illinois Urbana-Champaign deployment represents a single research reactor project, not a commercial power purchase agreement with an industrial or utility off-taker. University research reactors typically operate at lower capacity factors and serve academic missions rather than baseload power markets, constraining the revenue per unit and the reference plant value for commercial customers. Scaling beyond this first unit requires securing new sites, each with its own licensing, permitting, and stakeholder engagement processes. The company has disclosed no commercial letters of intent or site agreements beyond the university project, leaving the path to fleet deployment undefined.

  • IMPSA Agreement Remains Engineering Services Only

    The Engineering Services Master Agreement with IMPSA is explicitly non-exclusive and limited to design review, manufacturability assessment, and potential engineering deliverables over an initial six-month period. Future component fabrication, regional projects, or commercial activities are contingent on the results of the engineering work, regulatory requirements, and separate definitive agreements. IMPSA's ASME N-stamp capability is valuable, but the agreement does not guarantee capacity allocation, pricing, or schedule priority for KRONOS pressure vessel production. If IMPSA's order book from existing nuclear plant refurbishment work fills available slots, NANO Nuclear may face a fabrication bottleneck with few alternative qualified suppliers for Class 1 heavy components.

Peer percentiles

How NANO Nuclear Energy ranks

Ranked against the 27 companies in Coal and Uranium58 metrics · as of Nov 28, 2026

Valuation

12 metrics · Lower multiples rank higher; a negative multiple ranks last
  • P/ENegative earnings −14.8xMedian 22.3x 52nd
  • P/FCFNegative free cash flow −27.9xMedian 16.5x 72nd
  • P/Operating cash flowNegative operating cash flow −21.7xMedian 12.4x 48th
  • P/S >1,000xMedian 4.74x 1st
  • P/B 0.83xMedian 1.12x 60th
  • P/Tangible book 0.84xMedian 1.12x 60th
  • EV/EBITDAImplausibly low multiple 0.00xMedian 14.3x Not meaningful —
  • EV/EBITNegative EBIT −352xMedian 29.5x 71st
  • EV/Revenue —Median 1.94x No data —
  • EV/FCFNegative free cash flow −11.6xMedian 24.7x 50th
  • EV/Operating cash flowNegative operating cash flow −9.04xMedian 11.4x 38th
  • PEG (3Y EPS CAGR) —Median 7.80 No data —
Peer group

Peer Comparison

Companies in the Uranium
View all peers
S.No. Ticker Company Market CapP/EP/STotal Debt (Qtr)
1 CCJ Cameco Corp 27.86 Bn97.1011.11747.91 Mn
2 NXE NexGen Energy Ltd. 4.93 Bn-45.82--
3 HCC Warrior Met Coal, Inc. 4.50 Bn19.402.42153.02 Mn
4 CNR Core Natural Resources, Inc. 4.13 Bn54.090.94488.11 Mn
5 ARLP Alliance Resource Partners Lp 2.98 Bn9.581.35668.86 Mn
6 UEC Uranium Energy Corp 2.96 Bn-21.1079.561.68 Mn
7 BTU Peabody Energy Corp 2.11 Bn-14.530.51296.60 Mn
8 NNE Nano Nuclear Energy Inc. 0.51 Bn-14.752,393.36-