ZK International (ZKIN) Construction in Progress (2018 - 2025)
ZK International (ZKIN) has disclosed Construction in Progress for 6 consecutive years, with $1591.0 as the latest value for Q3 2025.
- On a quarterly basis, Construction in Progress changed N/A to $1591.0 in Q3 2025 year-over-year; TTM through Sep 2025 was $1591.0, a N/A change, with the full-year FY2025 number at $1591.0, changed N/A from a year prior.
- Construction in Progress was $1591.0 for Q3 2025 at ZK International, down from $899850.0 in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $899850.0 in Q3 2023 to a low of $1591.0 in Q3 2025.
- A 3-year average of $304369.7 and a median of $11668.0 in 2022 define the central range for Construction in Progress.
- Biggest YoY gain for Construction in Progress was 7612.12% in 2023; the steepest drop was 7612.12% in 2023.
- ZK International's Construction in Progress stood at $11668.0 in 2022, then soared by 7612.12% to $899850.0 in 2023, then plummeted by 99.82% to $1591.0 in 2025.
- Per Business Quant, the three most recent readings for ZKIN's Construction in Progress are $1591.0 (Q3 2025), $899850.0 (Q3 2023), and $11668.0 (Q3 2022).