Zepp Health (ZEPP) Construction in Progress (2023 - 2024)

Zepp Health has reported Construction in Progress over the past 2 years, most recently at $13000.0 for Q4 2024.

  • Quarterly results put Construction in Progress at $13000.0 for Q4 2024, down 91.28% from a year ago — trailing twelve months through Dec 2024 was $13000.0 (down 91.28% YoY), and the annual figure for FY2024 was $13000.0, down 91.28%.
  • Construction in Progress for Q4 2024 was $13000.0 at Zepp Health, down from $149000.0 in the prior quarter.
  • Over the last five years, Construction in Progress for ZEPP hit a ceiling of $149000.0 in Q4 2023 and a floor of $13000.0 in Q4 2024.