Growth Metrics

Xunlei (XNET) Construction in Progress: 2015-2021

Historic Construction in Progress for Xunlei (XNET) over the last 7 years, with Dec 2021 value amounting to $50.3 million.

  • Xunlei's Construction in Progress rose 30.82% to $50.3 million in Q4 2021 from the same period last year, while for Dec 2021 it was $50.3 million, marking a year-over-year increase of 30.82%. This contributed to the annual value of $50.3 million for FY2021, which is 30.82% up from last year.
  • According to the latest figures from FY2021, Xunlei's Construction in Progress is $50.3 million, which was up 30.82% from $38.4 million recorded in FY2020.
  • In the past 5 years, Xunlei's Construction in Progress ranged from a high of $50.3 million in FY2021 and a low of $4.5 million during FY2017.
  • Its 3-year average for Construction in Progress is $35.7 million, with a median of $38.4 million in 2020.
  • Data for Xunlei's Construction in Progress shows a peak YoY skyrocketed of 686.93% (in 2017) over the last 5 years.
  • Xunlei's Construction in Progress (Yearly) stood at $4.5 million in 2017, then surged by 49.99% to $6.8 million in 2018, then surged by 172.49% to $18.5 million in 2019, then skyrocketed by 108.12% to $38.4 million in 2020, then skyrocketed by 30.82% to $50.3 million in 2021.