Advanced Drainage Systems (WMS) Other Accumulated Expenses (2016 - 2025)
Historic Other Accumulated Expenses for Advanced Drainage Systems (WMS) over the last 12 years, with Q4 2025 value amounting to $193.9 million.
- Advanced Drainage Systems' Other Accumulated Expenses rose 1951.85% to $193.9 million in Q4 2025 from the same period last year, while for Dec 2025 it was $193.9 million, marking a year-over-year increase of 1951.85%. This contributed to the annual value of $137.3 million for FY2025, which is 1161.42% down from last year.
- As of Q4 2025, Advanced Drainage Systems' Other Accumulated Expenses stood at $193.9 million, which was up 1951.85% from $190.1 million recorded in Q3 2025.
- Advanced Drainage Systems' Other Accumulated Expenses' 5-year high stood at $193.9 million during Q4 2025, with a 5-year trough of $116.2 million in Q1 2021.
- Its 5-year average for Other Accumulated Expenses is $151.8 million, with a median of $150.3 million in 2022.
- As far as peak fluctuations go, Advanced Drainage Systems' Other Accumulated Expenses soared by 3077.85% in 2022, and later tumbled by 1161.42% in 2025.
- Quarter analysis of 5 years shows Advanced Drainage Systems' Other Accumulated Expenses stood at $140.6 million in 2021, then rose by 21.32% to $170.5 million in 2022, then decreased by 4.85% to $162.3 million in 2023, then fell by 0.04% to $162.2 million in 2024, then increased by 19.52% to $193.9 million in 2025.
- Its Other Accumulated Expenses stands at $193.9 million for Q4 2025, versus $190.1 million for Q3 2025 and $161.2 million for Q2 2025.