Wallbox (WBX) Construction in Progress (2020 - 2021)

Historic Construction in Progress for Wallbox (WBX) over the last 2 years, with Q4 2021 value amounting to $312178.3.

  • Wallbox's Construction in Progress rose 26449.43% to $312178.3 in Q4 2021 from the same period last year, while for Dec 2021 it was $312178.3, marking a year-over-year increase of 26449.43%. This contributed to the annual value of $322937.2 for FY2021, which is 27705.63% up from last year.
  • Latest data reveals that Wallbox reported Construction in Progress of $312178.3 as of Q4 2021, which was up 26449.43% from $85646.9 recorded in Q4 2020.
  • In the past 5 years, Wallbox's Construction in Progress ranged from a high of $312178.3 in Q4 2021 and a low of $85646.9 during Q4 2020