Ttm Technologies (TTMI) Construction in Progress (2023 - 2026)
Ttm Technologies' Construction in Progress history spans 8 years, with the latest figure at $156.5 million for Q1 2026.
- On a quarterly basis, Construction in Progress rose 92.07% to $156.5 million in Q1 2026 year-over-year; TTM through Mar 2026 was $156.5 million, a 92.07% increase, with the full-year FY2025 number at $101.9 million, up 35.02% from a year prior.
- Construction in Progress hit $156.5 million in Q1 2026 for Ttm Technologies, up from $101.9 million in the prior quarter.
- Over the last five years, Construction in Progress for TTMI hit a ceiling of $157.0 million in Q3 2025 and a floor of $27.8 million in Q1 2023.
- Historically, Construction in Progress has averaged $90.3 million across 4 years, with a median of $81.5 million in 2025.
- The widest YoY moves for Construction in Progress: up 227.43% in 2024, down 16.98% in 2024.
- Tracing TTMI's Construction in Progress over 4 years: stood at $27.8 million in 2023, then surged by 171.84% to $75.5 million in 2024, then surged by 35.02% to $101.9 million in 2025, then soared by 53.53% to $156.5 million in 2026.
- Business Quant data shows Construction in Progress for TTMI at $156.5 million in Q1 2026, $101.9 million in Q4 2025, and $157.0 million in Q3 2025.