Ttm Technologies (TTMI) Construction in Progress (2023 - 2025)
Ttm Technologies (TTMI) has disclosed Construction in Progress for 7 consecutive years, with $101.9 million as the latest value for Q4 2025.
- Quarterly Construction in Progress rose 35.02% to $101.9 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $101.9 million through Dec 2025, up 35.02% year-over-year, with the annual reading at $101.9 million for FY2025, 35.02% up from the prior year.
- Construction in Progress hit $101.9 million in Q4 2025 for Ttm Technologies, down from $157.0 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $157.0 million in Q3 2025 to a low of $27.8 million in Q1 2023.
- Historically, Construction in Progress has averaged $83.7 million across 3 years, with a median of $78.5 million in 2024.
- Biggest YoY gain for Construction in Progress was 227.43% in 2024; the steepest drop was 16.98% in 2024.
- Year by year, Construction in Progress stood at $27.8 million in 2023, then soared by 171.84% to $75.5 million in 2024, then soared by 35.02% to $101.9 million in 2025.
- Business Quant data shows Construction in Progress for TTMI at $101.9 million in Q4 2025, $157.0 million in Q3 2025, and $116.1 million in Q2 2025.