Growth Metrics

Vicor (VICR) Construction in Progress (2016 - 2025)

Vicor filings provide 14 years of Construction in Progress readings, the most recent being $7.9 million for Q4 2025.

  • On a quarterly basis, Construction in Progress fell 3.48% to $7.9 million in Q4 2025 year-over-year; TTM through Dec 2025 was $7.9 million, a 3.48% decrease, with the full-year FY2025 number at $7.9 million, down 3.48% from a year prior.
  • Construction in Progress hit $7.9 million in Q4 2025 for Vicor, down from $8.2 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $52.9 million in Q4 2022 to a low of $7.9 million in Q4 2025.
  • Median Construction in Progress over the past 5 years was $17.7 million (2023), compared with a mean of $27.0 million.
  • Biggest five-year swings in Construction in Progress: surged 167.35% in 2021 and later tumbled 66.52% in 2023.
  • Vicor's Construction in Progress stood at $48.1 million in 2021, then increased by 10.08% to $52.9 million in 2022, then tumbled by 66.52% to $17.7 million in 2023, then crashed by 53.57% to $8.2 million in 2024, then decreased by 3.48% to $7.9 million in 2025.
  • The last three reported values for Construction in Progress were $7.9 million (Q4 2025), $8.2 million (Q4 2024), and $17.7 million (Q4 2023) per Business Quant data.