Vicor (VICR) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Vicor (VICR) over the last 13 years, with Q4 2024 value amounting to $8.2 million.
- Vicor's Construction in Progress fell 5356.88% to $8.2 million in Q4 2024 from the same period last year, while for Dec 2024 it was $8.2 million, marking a year-over-year decrease of 5356.88%. This contributed to the annual value of $8.2 million for FY2024, which is 5356.88% down from last year.
- Latest data reveals that Vicor reported Construction in Progress of $8.2 million as of Q4 2024, which was down 5356.88% from $17.7 million recorded in Q4 2023.
- In the past 5 years, Vicor's Construction in Progress ranged from a high of $52.9 million in Q4 2022 and a low of $8.2 million during Q4 2024
- Its 5-year average for Construction in Progress is $29.0 million, with a median of $18.0 million in 2020.
- As far as peak fluctuations go, Vicor's Construction in Progress surged by 31235.67% in 2020, and later plummeted by 6652.06% in 2023.
- Vicor's Construction in Progress (Quarter) stood at $18.0 million in 2020, then surged by 167.35% to $48.1 million in 2021, then grew by 10.08% to $52.9 million in 2022, then crashed by 66.52% to $17.7 million in 2023, then plummeted by 53.57% to $8.2 million in 2024.
- Its Construction in Progress stands at $8.2 million for Q4 2024, versus $17.7 million for Q4 2023 and $52.9 million for Q4 2022.