Vicor (VICR) Construction in Progress (2016 - 2025)
Vicor's Construction in Progress history spans 14 years, with the latest figure at $7.9 million for Q4 2025.
- For Q4 2025, Construction in Progress fell 3.48% year-over-year to $7.9 million; the TTM value through Dec 2025 reached $7.9 million, down 3.48%, while the annual FY2025 figure was $7.9 million, 3.48% down from the prior year.
- Construction in Progress reached $7.9 million in Q4 2025 per VICR's latest filing, down from $8.2 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $52.9 million in Q4 2022 to a low of $7.9 million in Q4 2025.
- Average Construction in Progress over 5 years is $27.0 million, with a median of $17.7 million recorded in 2023.
- Peak YoY movement for Construction in Progress: skyrocketed 167.35% in 2021, then plummeted 66.52% in 2023.
- A 5-year view of Construction in Progress shows it stood at $48.1 million in 2021, then increased by 10.08% to $52.9 million in 2022, then tumbled by 66.52% to $17.7 million in 2023, then crashed by 53.57% to $8.2 million in 2024, then decreased by 3.48% to $7.9 million in 2025.
- Per Business Quant, the three most recent readings for VICR's Construction in Progress are $7.9 million (Q4 2025), $8.2 million (Q4 2024), and $17.7 million (Q4 2023).