WaterBridge Infrastructure (WBI) Other Operating Expenses (2024 - 2026)
WaterBridge Infrastructure's (WBI) quarterly Other Operating Expenses came in at $74000.0 in Q1 2026, up 107.35% year-on-year from $35688.7 in Q1 2025, and up 101.03% quarter-over-quarter from -$7.2 million in Q4 2025.
WaterBridge Infrastructure (WBI) Other Operating Expenses (2024 - 2026) Analysis & Trends
WaterBridge Infrastructure has disclosed Other Operating Expenses across 3 years of filings, most recently posting $74000.0 for Q1 2026.
- Other Operating Expenses for Q1 2026 came in at $74000.0, up 107.35% year-over-year; the trailing twelve-month figure through Mar 2026 was -$11.3 million (changed N/A YoY), and the FY2025 annual result was -$12.0 million, down 840.42% from the prior year.
- Other Operating Expenses came in at $74000.0 for Q1 2026 at WaterBridge Infrastructure, up from -$7.2 million in the prior quarter.
- In the past five years, Other Operating Expenses ranged from a high of $1.4 million in Q4 2024 to a low of -$7.2 million in Q4 2025.
- The 3-year median for Other Operating Expenses is -$1.0 million (2024), against an average of -$1.8 million.
- Across the five-year window, Other Operating Expenses sank 607.79% in 2025 and surged 107.35% in 2026, its largest moves.
- WaterBridge Infrastructure's Other Operating Expenses stood at $1.4 million in 2024, then tumbled by 607.79% to -$7.2 million in 2025, then soared by 101.03% to $74000.0 in 2026.
- The last three Other Operating Expenses figures came in at $74000.0 (Q1 2026), -$7.2 million (Q4 2025), and -$3.2 million (Q3 2025), per Business Quant data.
Peer Comparison
| # | Company | Market Cap | Enterprise Value | Gross Profit (Qtr) |
|---|---|---|---|---|
| 1 | Slb | 82.25 Bn | 80.04 Bn | 4.67 Bn |
| 2 | Baker Hughes | 61.96 Bn | 47.38 Bn | 1.51 Bn |
| 3 | Halliburton | 32.79 Bn | 30.84 Bn | 2.04 Bn |
| 4 | TechnipFMC | 26.73 Bn | 25.47 Bn | 1.49 Bn |
| 5 | Enerflex | 8.62 Bn | 8.57 Bn | - |
| 6 | Nov | 7.27 Bn | 5.98 Bn | 119.00 Mn |
| 7 | Weatherford International | 6.99 Bn | 5.94 Bn | 876.00 Mn |
| 8 | Archrock | 5.95 Bn | 5.95 Bn | 247.42 Mn |
| 9 | Kodiak Gas Services | 5.60 Bn | 5.50 Bn | 222.88 Mn |
| 10 | WaterBridge Infrastructure | 1.29 Bn | 2.43 Bn | 48.19 Mn |
Historic Data
Download Data| Date | Value |
|---|---|
| Mar 31, 2026 | 74,000.00 |
| Dec 31, 2025 | -7.17 Mn |
| Sep 16, 2025 | -3.18 Mn |
| Mar 31, 2025 | -1.01 Mn |
| Dec 31, 2024 | 1.41 Mn |
| Sep 30, 2024 | -1.09 Mn |