V2X VVX
NYSE VVX
$78.50 -0.51 (-0.65%)
At close: Aug 21, 2026 · 4:00 PM EDT

V2X (VVX) Curent Deferred Tax Liability (2013 - 2015)

V2X's (VVX) quarterly Curent Deferred Tax Liability came in at $22.4 million in Q3 2015, down 5.05% on a QoQ basis from $23.6 million in Q2 2015.

V2X (VVX) Curent Deferred Tax Liability (2013 - 2015) Analysis & Trends

V2X (VVX) has 3 years of Curent Deferred Tax Liability data on file, last reported at $22.4 million in Q3 2015.

  • Quarterly Curent Deferred Tax Liability changed N/A year-over-year to $22.4 million in Q3 2015, while the trailing twelve-month figure through Sep 2015 was $22.4 million (changed N/A YoY) and the FY2014 annual result came in at $25.4 million, up 3.03% from the prior year.
  • Curent Deferred Tax Liability declined to $22.4 million in Q3 2015, from $23.6 million in the prior quarter.
  • In the past five years, Curent Deferred Tax Liability ranged from a high of $25.4 million in Q4 2014 to a low of $22.4 million in Q3 2015.
  • A 3-year average of $24.2 million and a median of $24.6 million in 2015 frame the typical range for Curent Deferred Tax Liability.
  • The widest YoY moves for Curent Deferred Tax Liability: up 3.03% in 2014, down 3.03% in 2014.
  • Tracing VVX's Curent Deferred Tax Liability over 3 years: stood at $24.7 million in 2013, then rose by 3.03% to $25.4 million in 2014, then dropped by 11.7% to $22.4 million in 2015.
  • The last three Curent Deferred Tax Liability figures came in at $22.4 million (Q3 2015), $23.6 million (Q2 2015), and $24.6 million (Q1 2015), per Business Quant data.

Peer Comparison

# Company Market Cap Enterprise Value Gross Profit (Qtr) Curent Deferred Tax Liability (Qtr)
1 General Electric 362.92 Bn 353.58 Bn 6.95 Bn -
2 Rtx 284.24 Bn 275.94 Bn 9.91 Bn -
3 Boeing 169.32 Bn 149.30 Bn 2.41 Bn -
4 Lockheed Martin 129.93 Bn 126.14 Bn 2.45 Bn -
5 Howmet Aerospace 108.64 Bn 108.07 Bn 951.00 Mn -
6 General Dynamics 103.62 Bn 99.29 Bn 6.76 Bn -
7 Northrop Grumman 78.44 Bn 76.14 Bn 3.72 Bn -
8 TransDigm 69.14 Bn 66.37 Bn 1.63 Bn -
9 Axon Enterprise 50.64 Bn 49.97 Bn 546.45 Mn -
10 V2X 2.46 Bn 2.25 Bn 109.50 Mn -

Historic Data

Download Data
DateValue
Sep 25, 2015 22.44 Mn
Sep 25, 2015 22.44 Mn
Jun 26, 2015 23.64 Mn
Jun 26, 2015 23.64 Mn
Mar 27, 2015 24.61 Mn
Mar 27, 2015 24.61 Mn
Dec 31, 2014 25.41 Mn
Dec 31, 2014 25.41 Mn
Dec 31, 2013 24.67 Mn
Dec 31, 2013 24.67 Mn