Growth Metrics

Bristow (VTOL) Construction in Progress (2016 - 2021)

Bristow has reported Construction in Progress over the past 10 years, most recently at $5.4 million for Q1 2021.

  • For Q1 2021, Construction in Progress fell 30.77% year-over-year to $5.4 million; the TTM value through Mar 2021 reached $5.4 million, down 30.77%, while the annual FY2021 figure was $5.4 million, 30.77% down from the prior year.
  • Construction in Progress for Q1 2021 was $5.4 million at Bristow, down from $7.4 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $37.6 million in Q4 2017 and troughed at $5.4 million in Q1 2021.
  • A 5-year average of $11.0 million and a median of $7.2 million in 2018 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: plummeted 81.16% in 2018 and later rose 6.17% in 2020.
  • Year by year, Construction in Progress stood at $37.6 million in 2017, then plummeted by 81.16% to $7.1 million in 2018, then decreased by 1.64% to $7.0 million in 2019, then grew by 6.17% to $7.4 million in 2020, then dropped by 27.03% to $5.4 million in 2021.
  • Business Quant data shows Construction in Progress for VTOL at $5.4 million in Q1 2021, $7.4 million in Q4 2020, and $9.3 million in Q3 2020.