Bristow (VTOL) Construction in Progress (2016 - 2021)
Bristow has reported Construction in Progress over the past 10 years, most recently at $5.4 million for Q1 2021.
- Quarterly results put Construction in Progress at $5.4 million for Q1 2021, down 30.77% from a year ago — trailing twelve months through Mar 2021 was $5.4 million (down 30.77% YoY), and the annual figure for FY2021 was $5.4 million, changed.
- Construction in Progress for Q1 2021 was $5.4 million at Bristow, down from $7.4 million in the prior quarter.
- Over the last five years, Construction in Progress for VTOL hit a ceiling of $37.6 million in Q4 2017 and a floor of $5.4 million in Q1 2021.
- Median Construction in Progress over the past 5 years was $7.2 million (2018), compared with a mean of $11.0 million.
- Biggest five-year swings in Construction in Progress: crashed 81.16% in 2018 and later increased 6.17% in 2020.
- Bristow's Construction in Progress stood at $37.6 million in 2017, then crashed by 81.16% to $7.1 million in 2018, then dropped by 1.64% to $7.0 million in 2019, then rose by 6.17% to $7.4 million in 2020, then fell by 27.03% to $5.4 million in 2021.
- The last three reported values for Construction in Progress were $5.4 million (Q1 2021), $7.4 million (Q4 2020), and $9.3 million (Q3 2020) per Business Quant data.