Growth Metrics

Vishay Intertechnology (VSH) Construction in Progress (2016 - 2025)

Vishay Intertechnology's Construction in Progress history spans 17 years, with the latest figure at $464.5 million for Q4 2025.

  • On a quarterly basis, Construction in Progress rose 26.37% to $464.5 million in Q4 2025 year-over-year; TTM through Dec 2025 was $464.5 million, a 26.37% increase, with the full-year FY2025 number at $464.5 million, up 26.37% from a year prior.
  • Construction in Progress hit $464.5 million in Q4 2025 for Vishay Intertechnology, up from $428.9 million in the prior quarter.
  • Over the last five years, Construction in Progress for VSH hit a ceiling of $464.5 million in Q4 2025 and a floor of $91.4 million in Q3 2021.
  • Historically, Construction in Progress has averaged $252.3 million across 5 years, with a median of $238.8 million in 2022.
  • Biggest five-year swings in Construction in Progress: dropped 10.25% in 2021 and later skyrocketed 81.39% in 2023.
  • Tracing VSH's Construction in Progress over 5 years: stood at $145.8 million in 2021, then skyrocketed by 66.66% to $243.0 million in 2022, then increased by 19.57% to $290.6 million in 2023, then grew by 26.49% to $367.6 million in 2024, then increased by 26.37% to $464.5 million in 2025.
  • Business Quant data shows Construction in Progress for VSH at $464.5 million in Q4 2025, $428.9 million in Q3 2025, and $421.4 million in Q2 2025.