Growth Metrics

Vishay Precision (VPG) Construction in Progress (2016 - 2026)

Vishay Precision has reported Construction in Progress over the past 17 years, most recently at $3.3 million for Q2 2026.

  • Quarterly Construction in Progress rose 55.92% to $3.3 million in Q2 2026 from the year-ago period, while the trailing twelve-month figure was $3.3 million through Apr 2026, up 55.92% year-over-year, with the annual reading at $4.2 million for FY2025, 62.99% down from the prior year.
  • Construction in Progress was $3.3 million for Q2 2026 at Vishay Precision, down from $4.2 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $11.7 million in Q1 2024 and troughed at $2.1 million in Q1 2025.
  • The 5-year median for Construction in Progress is $10.1 million (2022), against an average of $7.9 million.
  • Year-over-year, Construction in Progress surged 118.15% in 2022 and then tumbled 82.14% in 2025.
  • A 5-year view of Construction in Progress shows it stood at $10.1 million in 2022, then rose by 12.94% to $11.4 million in 2023, then dropped by 1.17% to $11.2 million in 2024, then crashed by 62.99% to $4.2 million in 2025, then fell by 21.48% to $3.3 million in 2026.
  • Per Business Quant, the three most recent readings for VPG's Construction in Progress are $3.3 million (Q2 2026), $4.2 million (Q4 2025), and $3.5 million (Q3 2025).