Growth Metrics

Visteon (VC) Construction in Progress (2016 - 2025)

Visteon has reported Construction in Progress over the past 15 years, most recently at $92.0 million for Q4 2025.

  • Quarterly Construction in Progress rose 1.1% to $92.0 million in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $92.0 million through Dec 2025, up 1.1% year-over-year, with the annual reading at $92.0 million for FY2025, 1.1% up from the prior year.
  • Construction in Progress was $92.0 million for Q4 2025 at Visteon, up from $91.0 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $92.0 million in Q4 2025 and troughed at $47.0 million in Q4 2021.
  • The 5-year median for Construction in Progress is $83.0 million (2023), against an average of $73.0 million.
  • Biggest five-year swings in Construction in Progress: surged 59.62% in 2023 and later increased 1.1% in 2025.
  • Tracing VC's Construction in Progress over 5 years: stood at $47.0 million in 2021, then grew by 10.64% to $52.0 million in 2022, then skyrocketed by 59.62% to $83.0 million in 2023, then rose by 9.64% to $91.0 million in 2024, then rose by 1.1% to $92.0 million in 2025.
  • According to Business Quant data, Construction in Progress over the past three periods came in at $92.0 million, $91.0 million, and $83.0 million for Q4 2025, Q4 2024, and Q4 2023 respectively.