Visteon (VC) Construction in Progress (2016 - 2024)
Historic Construction in Progress for Visteon (VC) over the last 15 years, with Q4 2024 value amounting to $91.0 million.
- Visteon's Construction in Progress rose 963.86% to $91.0 million in Q4 2024 from the same period last year, while for Dec 2024 it was $91.0 million, marking a year-over-year increase of 963.86%. This contributed to the annual value of $91.0 million for FY2024, which is 963.86% up from last year.
- According to the latest figures from Q4 2024, Visteon's Construction in Progress is $91.0 million, which was up 963.86% from $83.0 million recorded in Q4 2023.
- In the past 5 years, Visteon's Construction in Progress ranged from a high of $91.0 million in Q4 2024 and a low of $44.0 million during Q4 2020
- For the 5-year period, Visteon's Construction in Progress averaged around $63.4 million, with its median value being $52.0 million (2022).
- Its Construction in Progress has fluctuated over the past 5 years, first crashed by 4500.0% in 2020, then skyrocketed by 5961.54% in 2023.
- Visteon's Construction in Progress (Quarter) stood at $44.0 million in 2020, then increased by 6.82% to $47.0 million in 2021, then rose by 10.64% to $52.0 million in 2022, then surged by 59.62% to $83.0 million in 2023, then grew by 9.64% to $91.0 million in 2024.
- Its Construction in Progress was $91.0 million in Q4 2024, compared to $83.0 million in Q4 2023 and $52.0 million in Q4 2022.