Growth Metrics

Unilever (UL) Construction in Progress: 2009-2024

Historic Construction in Progress for Unilever (UL) over the last 9 years, with Dec 2024 value amounting to $1.7 billion.

  • Unilever's Construction in Progress rose 27.69% to $1.7 billion in Q4 2024 from the same period last year, while for Dec 2024 it was $1.7 billion, marking a year-over-year increase of 27.69%. This contributed to the annual value of $1.7 billion for FY2024, which is 28.65% up from last year.
  • According to the latest figures from FY2024, Unilever's Construction in Progress is $1.7 billion, which was up 28.65% from $1.3 billion recorded in FY2023.
  • Unilever's 5-year Construction in Progress high stood at $1.7 billion for FY2024, and its period low was $839.2 million during FY2020.
  • Over the past 3 years, Unilever's median Construction in Progress value was $1.3 billion (recorded in 2023), while the average stood at $1.4 billion.
  • Its Construction in Progress has fluctuated over the past 5 years, first declined by 21.12% in 2020, then surged by 37.35% in 2021.
  • Over the past 5 years, Unilever's Construction in Progress (Yearly) stood at $839.2 million in 2020, then surged by 37.35% to $1.2 billion in 2021, then dropped by 2.71% to $1.1 billion in 2022, then climbed by 20.19% to $1.3 billion in 2023, then grew by 28.65% to $1.7 billion in 2024.