Growth Metrics

Universal Electronics (UEIC) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Universal Electronics (UEIC) over the last 14 years, with Q4 2024 value amounting to $1.3 million.

  • Universal Electronics' Construction in Progress fell 5119.05% to $1.3 million in Q4 2024 from the same period last year, while for Dec 2024 it was $1.3 million, marking a year-over-year decrease of 5119.05%. This contributed to the annual value of $1.3 million for FY2024, which is 5119.05% down from last year.
  • Latest data reveals that Universal Electronics reported Construction in Progress of $1.3 million as of Q4 2024, which was down 5119.05% from $2.7 million recorded in Q4 2023.
  • Over the past 5 years, Universal Electronics' Construction in Progress peaked at $9.9 million during Q4 2022, and registered a low of $1.3 million during Q4 2024.
  • In the last 5 years, Universal Electronics' Construction in Progress had a median value of $4.9 million in 2021 and averaged $5.2 million.
  • As far as peak fluctuations go, Universal Electronics' Construction in Progress soared by 10308.07% in 2022, and later crashed by 7281.55% in 2023.
  • Universal Electronics' Construction in Progress (Quarter) stood at $7.3 million in 2020, then plummeted by 32.98% to $4.9 million in 2021, then soared by 103.08% to $9.9 million in 2022, then crashed by 72.82% to $2.7 million in 2023, then crashed by 51.19% to $1.3 million in 2024.
  • Its Construction in Progress was $1.3 million in Q4 2024, compared to $2.7 million in Q4 2023 and $9.9 million in Q4 2022.