Growth Metrics

Ultra Clean Holdings (UCTT) Construction in Progress: 2016-2024

Historic Construction in Progress for Ultra Clean Holdings (UCTT) over the last 9 years, with FY2024 value amounting to $37.9 million.

  • Ultra Clean Holdings' Construction in Progress fell 1895.6% to $29.5 million in Q3 2025 from the same period last year, while for Sep 2025 it was $29.5 million, marking a year-over-year decrease of 1895.6%. This contributed to the annual value of $37.9 million for FY2024, which is 641.98% down from last year.
  • As of FY2024, Ultra Clean Holdings' Construction in Progress stood at $37.9 million, which was down 641.98% from $40.5 million recorded in FY2023.
  • In the past 5 years, Ultra Clean Holdings' Construction in Progress ranged from a high of $56.8 million in FY2022 and a low of $34.8 million during FY2020
  • In the last 5 years, Ultra Clean Holdings' Construction in Progress had a median value of $38.7 million in 2021 and averaged $41.7 million.
  • Its Construction in Progress has fluctuated over the past 5 years, first skyrocketed by 4677.0% in 2022, then crashed by 2869.72% in 2023.
  • Annual analysis of 5 years shows Ultra Clean Holdings' Construction in Progress stood at $34.8 million in 2020, then grew by 11.21% to $38.7 million in 2021, then skyrocketed by 46.77% to $56.8 million in 2022, then fell by 28.7% to $40.5 million in 2023, then dropped by 6.42% to $37.9 million in 2024.
  • Its Construction in Progress was $37.9 million in FY2024, compared to $40.5 million in FY2023 and $56.8 million in FY2022.