Growth Metrics

Us Nuclear (UCLE) Work In Process (2023 - 2025)

Us Nuclear's Work In Process history spans 3 years, with the latest figure at $556025.0 for Q3 2025.

  • On a quarterly basis, Work In Process rose 196.86% to $556025.0 in Q3 2025 year-over-year; TTM through Sep 2025 was $556025.0, a 196.86% increase, with the full-year FY2024 number at $446044.0, up 57.3% from a year prior.
  • Work In Process hit $556025.0 in Q3 2025 for Us Nuclear, up from $417903.0 in the prior quarter.
  • Over the last five years, Work In Process for UCLE hit a ceiling of $556025.0 in Q3 2025 and a floor of $187304.0 in Q3 2024.
  • Historically, Work In Process has averaged $358918.5 across 3 years, with a median of $379246.0 in 2024.
  • The widest YoY moves for Work In Process: up 196.86% in 2025, down 13.9% in 2025.
  • Tracing UCLE's Work In Process over 3 years: stood at $283568.0 in 2023, then soared by 57.3% to $446044.0 in 2024, then increased by 24.66% to $556025.0 in 2025.
  • Business Quant data shows Work In Process for UCLE at $556025.0 in Q3 2025, $417903.0 in Q2 2025, and $350928.0 in Q1 2025.