Us Nuclear (UCLE) Work In Process (2023 - 2025)
Us Nuclear (UCLE) has disclosed Work In Process for 3 consecutive years, with $556025.0 as the latest value for Q3 2025.
- Quarterly Work In Process rose 196.86% to $556025.0 in Q3 2025 from the year-ago period, while the trailing twelve-month figure was $556025.0 through Sep 2025, up 196.86% year-over-year, with the annual reading at $446044.0 for FY2024, 57.3% up from the prior year.
- Work In Process hit $556025.0 in Q3 2025 for Us Nuclear, up from $417903.0 in the prior quarter.
- In the past five years, Work In Process ranged from a high of $556025.0 in Q3 2025 to a low of $187304.0 in Q3 2024.
- Historically, Work In Process has averaged $358918.5 across 3 years, with a median of $379246.0 in 2024.
- Biggest YoY gain for Work In Process was 196.86% in 2025; the steepest drop was 13.9% in 2025.
- Year by year, Work In Process stood at $283568.0 in 2023, then skyrocketed by 57.3% to $446044.0 in 2024, then rose by 24.66% to $556025.0 in 2025.
- Business Quant data shows Work In Process for UCLE at $556025.0 in Q3 2025, $417903.0 in Q2 2025, and $350928.0 in Q1 2025.