Cash Flow Statement
Growth Metrics

AgEagle Aerial Systems (UAVS) Work In Process (2017 - 2025)

AgEagle Aerial Systems has reported Work In Process over the past 8 years, most recently at $820398.0 for Q4 2025.

  • Quarterly Work In Process fell 10.08% to $820398.0 in Q4 2025 from the year-ago period, while the trailing twelve-month figure was $820398.0 through Dec 2025, down 10.08% year-over-year, with the annual reading at $820398.0 for FY2025, 10.08% down from the prior year.
  • Work In Process was $820398.0 for Q4 2025 at AgEagle Aerial Systems, down from $912397.0 in the prior quarter.
  • Over five years, Work In Process peaked at $1.4 million in Q3 2022 and troughed at $466994.0 in Q2 2022.
  • The 5-year median for Work In Process is $859506.0 (2023), against an average of $880589.5.
  • Year-over-year, Work In Process surged 1184.18% in 2021 and then fell 10.08% in 2025.
  • A 5-year view of Work In Process shows it stood at $647829.0 in 2021, then soared by 70.73% to $1.1 million in 2022, then fell by 18.76% to $898614.0 in 2023, then rose by 1.53% to $912397.0 in 2024, then decreased by 10.08% to $820398.0 in 2025.
  • Per Business Quant, the three most recent readings for UAVS's Work In Process are $820398.0 (Q4 2025), $912397.0 (Q4 2024), and $898614.0 (Q1 2023).