Tower Semiconductor (TSEM) Operating Leases (2017 - 2024)
Historic Operating Leases for Tower Semiconductor (TSEM) over the last 7 years, with Q4 2024 value amounting to $7.9 million.
- Tower Semiconductor's Operating Leases fell 1934.03% to $7.9 million in Q4 2024 from the same period last year, while for Dec 2024 it was $7.9 million, marking a year-over-year decrease of 1934.03%. This contributed to the annual value of $7.9 million for FY2024, which is 1934.03% down from last year.
- Tower Semiconductor's Operating Leases amounted to $7.9 million in Q4 2024, which was down 1934.03% from $9.8 million recorded in Q4 2023.
- Tower Semiconductor's Operating Leases' 5-year high stood at $14.1 million during Q4 2021, with a 5-year trough of $7.9 million in Q4 2024.
- For the 4-year period, Tower Semiconductor's Operating Leases averaged around $10.5 million, with its median value being $10.1 million (2022).
- Per our database at Business Quant, Tower Semiconductor's Operating Leases plummeted by 2662.79% in 2022 and then crashed by 572.67% in 2023.
- Quarter analysis of 4 years shows Tower Semiconductor's Operating Leases stood at $14.1 million in 2021, then decreased by 26.63% to $10.4 million in 2022, then decreased by 5.73% to $9.8 million in 2023, then decreased by 19.34% to $7.9 million in 2024.
- Its Operating Leases stands at $7.9 million for Q4 2024, versus $9.8 million for Q4 2023 and $10.4 million for Q4 2022.