Growth Metrics

Tower Semiconductor (TSEM) Operating Leases (2016 - 2024)

Historic Operating Leases for Tower Semiconductor (TSEM) over the last 7 years, with Q4 2024 value amounting to $7.9 million.

  • Tower Semiconductor's Operating Leases fell 1934.03% to $7.9 million in Q4 2024 from the same period last year, while for Dec 2024 it was $7.9 million, marking a year-over-year decrease of 1934.03%. This contributed to the annual value of $7.9 million for FY2024, which is 1934.03% down from last year.
  • Tower Semiconductor's Operating Leases amounted to $7.9 million in Q4 2024, which was down 1934.03% from $9.8 million recorded in Q4 2023.
  • In the past 5 years, Tower Semiconductor's Operating Leases ranged from a high of $14.1 million in Q4 2021 and a low of $7.9 million during Q4 2024
  • Its 4-year average for Operating Leases is $10.5 million, with a median of $10.1 million in 2022.
  • Its Operating Leases has fluctuated over the past 5 years, first crashed by 2662.79% in 2022, then tumbled by 572.67% in 2023.
  • Over the past 4 years, Tower Semiconductor's Operating Leases (Quarter) stood at $14.1 million in 2021, then dropped by 26.63% to $10.4 million in 2022, then dropped by 5.73% to $9.8 million in 2023, then dropped by 19.34% to $7.9 million in 2024.
  • Its last three reported values are $7.9 million in Q4 2024, $9.8 million for Q4 2023, and $10.4 million during Q4 2022.