Growth Metrics

Trivago (TRVG) Construction in Progress (2021 - 2023)

Trivago has reported Construction in Progress over the past 3 years, most recently at $950.6 million for Q2 2023.

  • Quarterly Construction in Progress rose 406.19% to $950.6 million in Q2 2023 from the year-ago period, while the trailing twelve-month figure was $950.6 million through Jun 2023, up 406.19% year-over-year, with the annual reading at $587.1 million for FY2022, 55.43% down from the prior year.
  • Construction in Progress was $950.6 million for Q2 2023 at Trivago, up from $782.5 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $1.3 billion in Q4 2021 and troughed at $98.8 million in Q1 2022.
  • The 3-year median for Construction in Progress is $568.3 million (2022), against an average of $612.5 million.
  • Year-over-year, Construction in Progress plummeted 55.37% in 2022 and then skyrocketed 692.24% in 2023.
  • A 3-year view of Construction in Progress shows it stood at $1.3 billion in 2021, then plummeted by 55.37% to $568.3 million in 2022, then skyrocketed by 67.28% to $950.6 million in 2023.
  • Per Business Quant, the three most recent readings for TRVG's Construction in Progress are $950.6 million (Q2 2023), $782.5 million (Q1 2023), and $568.3 million (Q4 2022).