Growth Metrics

Trivago (TRVG) Construction in Progress (2016 - 2023)

Historic Construction in Progress for Trivago (TRVG) over the last 5 years, with Q2 2023 value amounting to $950.6 million.

  • Trivago's Construction in Progress rose 40618.79% to $950.6 million in Q2 2023 from the same period last year, while for Jun 2023 it was $950.6 million, marking a year-over-year increase of 40618.79%. This contributed to the annual value of $587.1 million for FY2022, which is 5542.9% down from last year.
  • Per Trivago's latest filing, its Construction in Progress stood at $950.6 million for Q2 2023, which was up 40618.79% from $782.5 million recorded in Q1 2023.
  • Trivago's Construction in Progress' 5-year high stood at $1.3 billion during Q4 2021, with a 5-year trough of $98.8 million in Q1 2022.
  • Its 3-year average for Construction in Progress is $612.5 million, with a median of $568.3 million in 2022.
  • Per our database at Business Quant, Trivago's Construction in Progress tumbled by 5536.76% in 2022 and then skyrocketed by 69224.48% in 2023.
  • Over the past 3 years, Trivago's Construction in Progress (Quarter) stood at $1.3 billion in 2021, then plummeted by 55.37% to $568.3 million in 2022, then surged by 67.28% to $950.6 million in 2023.
  • Its Construction in Progress was $950.6 million in Q2 2023, compared to $782.5 million in Q1 2023 and $568.3 million in Q4 2022.