Growth Metrics

Trupanion (TRUP) Construction in Progress (2019 - 2025)

Trupanion's Construction in Progress history spans 7 years, with the latest figure at $9.8 million for Q4 2025.

  • For Q4 2025, Construction in Progress fell 39.24% year-over-year to $9.8 million; the TTM value through Dec 2025 reached $9.8 million, down 39.24%, while the annual FY2025 figure was $9.8 million, 39.24% down from the prior year.
  • Construction in Progress reached $9.8 million in Q4 2025 per TRUP's latest filing, down from $16.1 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $34.6 million in Q4 2023 to a low of $540000.0 in Q4 2021.
  • Average Construction in Progress over 5 years is $16.5 million, with a median of $16.1 million recorded in 2024.
  • Peak YoY movement for Construction in Progress: plummeted 81.09% in 2021, then skyrocketed 3865.74% in 2022.
  • A 5-year view of Construction in Progress shows it stood at $540000.0 in 2021, then surged by 3865.74% to $21.4 million in 2022, then soared by 61.7% to $34.6 million in 2023, then tumbled by 53.59% to $16.1 million in 2024, then tumbled by 39.24% to $9.8 million in 2025.
  • Per Business Quant, the three most recent readings for TRUP's Construction in Progress are $9.8 million (Q4 2025), $16.1 million (Q4 2024), and $34.6 million (Q4 2023).