Growth Metrics

Trupanion (TRUP) Construction in Progress (2019 - 2025)

Trupanion filings provide 7 years of Construction in Progress readings, the most recent being $9.8 million for Q4 2025.

  • On a quarterly basis, Construction in Progress fell 39.24% to $9.8 million in Q4 2025 year-over-year; TTM through Dec 2025 was $9.8 million, a 39.24% decrease, with the full-year FY2025 number at $9.8 million, down 39.24% from a year prior.
  • Construction in Progress hit $9.8 million in Q4 2025 for Trupanion, down from $16.1 million in the prior quarter.
  • In the past five years, Construction in Progress ranged from a high of $34.6 million in Q4 2023 to a low of $540000.0 in Q4 2021.
  • Median Construction in Progress over the past 5 years was $16.1 million (2024), compared with a mean of $16.5 million.
  • Biggest five-year swings in Construction in Progress: tumbled 81.09% in 2021 and later surged 3865.74% in 2022.
  • Trupanion's Construction in Progress stood at $540000.0 in 2021, then surged by 3865.74% to $21.4 million in 2022, then soared by 61.7% to $34.6 million in 2023, then tumbled by 53.59% to $16.1 million in 2024, then tumbled by 39.24% to $9.8 million in 2025.
  • The last three reported values for Construction in Progress were $9.8 million (Q4 2025), $16.1 million (Q4 2024), and $34.6 million (Q4 2023) per Business Quant data.