Growth Metrics

Torm (TRMD) Construction in Progress (2023 - 2025)

Historic Construction in Progress for Torm (TRMD) over the last 3 years, with Q2 2025 value amounting to $2.2 million.

  • Torm's Construction in Progress fell 4358.97% to $2.2 million in Q2 2025 from the same period last year, while for Jun 2025 it was $2.2 million, marking a year-over-year decrease of 4358.97%. This contributed to the annual value of $4.6 million for FY2024, which is 952.38% up from last year.
  • As of Q2 2025, Torm's Construction in Progress stood at $2.2 million, which was down 4358.97% from $2.4 recorded in Q1 2025.
  • Torm's Construction in Progress' 5-year high stood at $4.6 million during Q4 2024, with a 5-year trough of $2.4 in Q1 2025.
  • Moreover, its 3-year median value for Construction in Progress was $3.0 million (2024), whereas its average is $2.5 million.
  • Per our database at Business Quant, Torm's Construction in Progress surged by 952.38% in 2024 and then crashed by 4358.97% in 2025.
  • Torm's Construction in Progress (Quarter) stood at $4.2 million in 2023, then increased by 9.52% to $4.6 million in 2024, then crashed by 52.17% to $2.2 million in 2025.
  • Its Construction in Progress was $2.2 million in Q2 2025, compared to $2.4 in Q1 2025 and $4.6 million in Q4 2024.