Growth Metrics

Torm (TRMD) Construction in Progress (2023 - 2025)

Torm has reported Construction in Progress over the past 3 years, most recently at $3.4 million for Q4 2025.

  • For Q4 2025, Construction in Progress fell 26.09% year-over-year to $3.4 million; the TTM value through Dec 2025 reached $3.4 million, down 26.09%, while the annual FY2025 figure was $3.4 million, 26.09% down from the prior year.
  • Construction in Progress for Q4 2025 was $3.4 million at Torm, up from $2.2 million in the prior quarter.
  • Over five years, Construction in Progress peaked at $4.6 million in Q4 2024 and troughed at $2.4 in Q1 2025.
  • A 3-year average of $2.6 million and a median of $3.4 million in 2025 define the central range for Construction in Progress.
  • Biggest five-year swings in Construction in Progress: grew 9.52% in 2024 and later crashed 43.59% in 2025.
  • Year by year, Construction in Progress stood at $4.2 million in 2023, then rose by 9.52% to $4.6 million in 2024, then dropped by 26.09% to $3.4 million in 2025.
  • Business Quant data shows Construction in Progress for TRMD at $3.4 million in Q4 2025, $2.2 million in Q2 2025, and $2.4 in Q1 2025.