Top Ships (TOPS) Construction in Progress (2016 - 2025)
Top Ships has reported Construction in Progress over the past 9 years, most recently at -$3.5 million for Q2 2025.
- For Q2 2025, Construction in Progress changed N/A year-over-year to -$3.5 million; the TTM value through Jun 2025 reached -$3.5 million, changed N/A, while the annual FY2021 figure was $30.6 million, 3.4% down from the prior year.
- Construction in Progress for Q2 2025 was -$3.5 million at Top Ships, up from -$216.6 million in the prior quarter.
- Over five years, Construction in Progress peaked at $30.6 million in Q4 2021 and troughed at -$216.6 million in Q2 2022.
- A 3-year average of -$71.9 million and a median of -$50.9 million in 2021 define the central range for Construction in Progress.
- On a YoY basis, Construction in Progress climbed as much as 3.4% in 2021 and fell as far as 482.38% in 2021.
- Year by year, Construction in Progress stood at $30.6 million in 2021, then tumbled by 808.2% to -$216.6 million in 2022, then skyrocketed by 98.39% to -$3.5 million in 2025.
- Business Quant data shows Construction in Progress for TOPS at -$3.5 million in Q2 2025, -$216.6 million in Q2 2022, and $30.6 million in Q4 2021.