Growth Metrics

Tilly'S (TLYS) Construction in Progress (2017 - 2026)

Tilly'S has reported Construction in Progress over the past 15 years, most recently at $4.4 million for Q1 2026.

  • Quarterly results put Construction in Progress at $4.4 million for Q1 2026, up 50.36% from a year ago — trailing twelve months through Jan 2026 was $4.4 million (up 50.36% YoY), and the annual figure for FY2026 was $4.4 million, up 50.36%.
  • Construction in Progress for Q1 2026 was $4.4 million at Tilly'S, up from $2.9 million in the prior quarter.
  • Over the last five years, Construction in Progress for TLYS hit a ceiling of $6.2 million in Q1 2023 and a floor of $2.9 million in Q1 2025.
  • Median Construction in Progress over the past 5 years was $4.4 million (2026), compared with a mean of $4.4 million.
  • Biggest five-year swings in Construction in Progress: soared 71.89% in 2023 and later plummeted 36.5% in 2025.
  • Tilly'S's Construction in Progress stood at $3.6 million in 2022, then soared by 71.89% to $6.2 million in 2023, then dropped by 25.36% to $4.6 million in 2024, then plummeted by 36.5% to $2.9 million in 2025, then skyrocketed by 50.36% to $4.4 million in 2026.
  • The last three reported values for Construction in Progress were $4.4 million (Q1 2026), $2.9 million (Q1 2025), and $4.6 million (Q1 2024) per Business Quant data.