Growth Metrics

Tilly'S (TLYS) Construction in Progress (2017 - 2025)

Historic Construction in Progress for Tilly'S (TLYS) over the last 14 years, with Q1 2025 value amounting to $2.9 million.

  • Tilly'S's Construction in Progress fell 3650.28% to $2.9 million in Q1 2025 from the same period last year, while for Feb 2025 it was $2.9 million, marking a year-over-year decrease of 3650.28%. This contributed to the annual value of $2.9 million for FY2025, which is 3650.28% down from last year.
  • Latest data reveals that Tilly'S reported Construction in Progress of $2.9 million as of Q1 2025, which was down 3650.28% from $4.6 million recorded in Q1 2024.
  • Tilly'S's Construction in Progress' 5-year high stood at $6.2 million during Q1 2023, with a 5-year trough of $2.9 million in Q1 2025.
  • Its 5-year average for Construction in Progress is $4.4 million, with a median of $4.6 million in 2024.
  • As far as peak fluctuations go, Tilly'S's Construction in Progress skyrocketed by 10657.78% in 2021, and later plummeted by 3650.28% in 2025.
  • Quarter analysis of 5 years shows Tilly'S's Construction in Progress stood at $4.8 million in 2021, then fell by 24.77% to $3.6 million in 2022, then surged by 71.89% to $6.2 million in 2023, then dropped by 25.36% to $4.6 million in 2024, then tumbled by 36.5% to $2.9 million in 2025.
  • Its last three reported values are $2.9 million in Q1 2025, $4.6 million for Q1 2024, and $6.2 million during Q1 2023.