Alpha Teknova (TKNO) Work In Process (2020 - 2025)
Alpha Teknova (TKNO) has disclosed Work In Process for 6 consecutive years, with $101000.0 as the latest value for Q4 2025.
- On a quarterly basis, Work In Process rose 320.83% to $101000.0 in Q4 2025 year-over-year; TTM through Dec 2025 was $101000.0, a 320.83% increase, with the full-year FY2025 number at $101000.0, up 320.83% from a year prior.
- Work In Process was $101000.0 for Q4 2025 at Alpha Teknova, down from $112000.0 in the prior quarter.
- In the past five years, Work In Process ranged from a high of $276000.0 in Q1 2024 to a low of $24000.0 in Q4 2024.
- A 5-year average of $113526.3 and a median of $108000.0 in 2023 define the central range for Work In Process.
- Biggest YoY gain for Work In Process was 320.83% in 2025; the steepest drop was 84.78% in 2025.
- Alpha Teknova's Work In Process stood at $105000.0 in 2021, then soared by 77.14% to $186000.0 in 2022, then tumbled by 74.73% to $47000.0 in 2023, then crashed by 48.94% to $24000.0 in 2024, then soared by 320.83% to $101000.0 in 2025.
- Per Business Quant, the three most recent readings for TKNO's Work In Process are $101000.0 (Q4 2025), $112000.0 (Q3 2025), and $87000.0 (Q2 2025).