Growth Metrics

Teekay (TK) Construction in Progress (2016 - 2018)

Historic Construction in Progress for Teekay (TK) over the last 10 years, with Q4 2018 value amounting to $86.9 million.

  • Teekay's Construction in Progress fell 8044.02% to $86.9 million in Q4 2018 from the same period last year, while for Dec 2018 it was $86.9 million, marking a year-over-year decrease of 8044.02%. This contributed to the annual value of $86.9 million for FY2018, which is 8044.02% down from last year.
  • Latest data reveals that Teekay reported Construction in Progress of $86.9 million as of Q4 2018, which was down 8044.02% from $172.2 million recorded in Q3 2018.
  • Over the past 5 years, Teekay's Construction in Progress peaked at $1.7 billion during Q4 2014, and registered a low of $164000.0 during Q1 2014.
  • In the last 5 years, Teekay's Construction in Progress had a median value of $772.1 million in 2015 and averaged $757.6 million.
  • As far as peak fluctuations go, Teekay's Construction in Progress skyrocketed by 11429.72% in 2014, and later crashed by 8044.02% in 2018.
  • Over the past 5 years, Teekay's Construction in Progress (Quarter) stood at $1.7 billion in 2014, then crashed by 52.07% to $817.9 million in 2015, then increased by 20.76% to $987.7 million in 2016, then plummeted by 55.0% to $444.5 million in 2017, then plummeted by 80.44% to $86.9 million in 2018.
  • Its Construction in Progress stands at $86.9 million for Q4 2018, versus $172.2 million for Q3 2018 and $349.2 million for Q2 2018.