Teekay (TK) Construction in Progress (2016 - 2018)
Historic Construction in Progress for Teekay (TK) over the last 10 years, with Q4 2018 value amounting to $86.9 million.
- Teekay's Construction in Progress fell 8044.02% to $86.9 million in Q4 2018 from the same period last year, while for Dec 2018 it was $86.9 million, marking a year-over-year decrease of 8044.02%. This contributed to the annual value of $86.9 million for FY2018, which is 8044.02% down from last year.
- As of Q4 2018, Teekay's Construction in Progress stood at $86.9 million, which was down 8044.02% from $172.2 million recorded in Q3 2018.
- Over the past 5 years, Teekay's Construction in Progress peaked at $1.7 billion during Q4 2014, and registered a low of $164000.0 during Q1 2014.
- Over the past 5 years, Teekay's median Construction in Progress value was $772.1 million (recorded in 2015), while the average stood at $757.6 million.
- Per our database at Business Quant, Teekay's Construction in Progress skyrocketed by 11429.72% in 2014 and then crashed by 8044.02% in 2018.
- Quarter analysis of 5 years shows Teekay's Construction in Progress stood at $1.7 billion in 2014, then crashed by 52.07% to $817.9 million in 2015, then increased by 20.76% to $987.7 million in 2016, then plummeted by 55.0% to $444.5 million in 2017, then plummeted by 80.44% to $86.9 million in 2018.
- Its Construction in Progress stands at $86.9 million for Q4 2018, versus $172.2 million for Q3 2018 and $349.2 million for Q2 2018.