Growth Metrics

Tegna (TGNA) Construction in Progress (2016 - 2025)

Tegna's Construction in Progress history spans 16 years, with the latest figure at $10.5 million for Q4 2025.

  • For Q4 2025, Construction in Progress changed N/A year-over-year to $10.5 million; the TTM value through Dec 2025 reached $10.5 million, changed N/A, while the annual FY2025 figure was $10.5 million, N/A changed from the prior year.
  • Construction in Progress for Q4 2025 was $10.5 million at Tegna, up from $7.8 million in the prior quarter.
  • Across five years, Construction in Progress topped out at $10.8 million in Q4 2021 and bottomed at $7.8 million in Q4 2023.
  • The 4-year median for Construction in Progress is $9.6 million (2022), against an average of $9.4 million.
  • The largest annual shift saw Construction in Progress tumbled 38.15% in 2021 before it decreased 10.08% in 2023.
  • A 4-year view of Construction in Progress shows it stood at $10.8 million in 2021, then dropped by 19.63% to $8.6 million in 2022, then decreased by 10.08% to $7.8 million in 2023, then surged by 34.85% to $10.5 million in 2025.
  • Per Business Quant, the three most recent readings for TGNA's Construction in Progress are $10.5 million (Q4 2025), $7.8 million (Q4 2023), and $8.6 million (Q4 2022).