Growth Metrics

Tegna (TGNA) Construction in Progress (2016 - 2024)

Historic Construction in Progress for Tegna (TGNA) over the last 16 years, with Q4 2024 value amounting to $6.0 million.

  • Tegna's Construction in Progress fell 2237.37% to $6.0 million in Q4 2024 from the same period last year, while for Dec 2024 it was $6.0 million, marking a year-over-year decrease of 2237.37%. This contributed to the annual value of $6.0 million for FY2024, which is 2237.37% down from last year.
  • Tegna's Construction in Progress amounted to $6.0 million in Q4 2024, which was down 2237.37% from $7.8 million recorded in Q4 2023.
  • Over the past 5 years, Tegna's Construction in Progress peaked at $17.4 million during Q4 2020, and registered a low of $6.0 million during Q4 2024.
  • In the last 5 years, Tegna's Construction in Progress had a median value of $8.6 million in 2022 and averaged $10.1 million.
  • As far as peak fluctuations go, Tegna's Construction in Progress crashed by 4931.24% in 2020, and later tumbled by 1008.21% in 2023.
  • Over the past 5 years, Tegna's Construction in Progress (Quarter) stood at $17.4 million in 2020, then crashed by 38.15% to $10.8 million in 2021, then dropped by 19.63% to $8.6 million in 2022, then fell by 10.08% to $7.8 million in 2023, then fell by 22.37% to $6.0 million in 2024.
  • Its Construction in Progress was $6.0 million in Q4 2024, compared to $7.8 million in Q4 2023 and $8.6 million in Q4 2022.