Transact Technologies (TACT) Construction in Progress: 2023-2024
- Transact Technologies' Construction in Progress fell 78.65% to $73,000 in Q4 2024 from the same period last year, while for Dec 2024 it was $73,000, marking a year-over-year decrease of 78.65%. This contributed to the annual value of $73,000 for FY2024, which is 78.65% down from last year.
- According to the latest figures from Q4 2024, Transact Technologies' Construction in Progress is $73,000, which was down 78.65% from $342,000 recorded in Q4 2023.
- Transact Technologies' Construction in Progress' 5-year high stood at $342,000 during Q4 2023, with a 5-year trough of $73,000 in Q4 2024.
- For the 2-year period, Transact Technologies' Construction in Progress averaged around $207,500, with its median value being $207,500 (2023).
- Data for Transact Technologies' Construction in Progress shows a maximum YoY plummeted of 78.65% (in 2024) over the last 5 years.
- Over the past 2 years, Transact Technologies' Construction in Progress (Quarterly) stood at $342,000 in 2023, then slumped by 78.65% to $73,000 in 2024.