Growth Metrics

Transalta (TACPF) Construction in Progress (2022 - 2025)

Historic Construction in Progress for Transalta (TACPF) over the last 3 years, with Q3 2025 value amounting to -$2.2 million.

  • Transalta's Construction in Progress rose 2567.51% to -$2.2 million in Q3 2025 from the same period last year, while for Sep 2025 it was -$2.2 million, marking a year-over-year increase of 2567.51%. This contributed to the annual value of $59.2 million for FY2022, which is N/A changed from last year.
  • Per Transalta's latest filing, its Construction in Progress stood at -$2.2 million for Q3 2025, which was up 2567.51% from -$2.9 million recorded in Q2 2025.
  • Transalta's 5-year Construction in Progress high stood at $56.7 million for Q4 2022, and its period low was -$2.9 million during Q3 2024.
  • Its 3-year average for Construction in Progress is $9.2 million, with a median of -$2.9 million in 2025.
  • Examining YoY changes over the last 5 years, Transalta's Construction in Progress showed a top increase of 2567.51% in 2025 and a maximum decrease of 128.95% in 2025.
  • Over the past 3 years, Transalta's Construction in Progress (Quarter) stood at $56.7 million in 2022, then plummeted by 105.17% to -$2.9 million in 2024, then increased by 25.68% to -$2.2 million in 2025.
  • Its last three reported values are -$2.2 million in Q3 2025, -$2.9 million for Q2 2025, and -$2.9 million during Q3 2024.