Growth Metrics

SWK Holdings (SWKH) Construction in Progress (2020)

SWK Holdings (SWKH) has disclosed Construction in Progress for 1 consecutive years, with $2.8 million as the latest value for Q4 2020.

  • On a quarterly basis, Construction in Progress changed N/A to $2.8 million in Q4 2020 year-over-year; TTM through Dec 2020 was $2.8 million, a N/A change, with the full-year FY2020 number at $2.8 million, changed N/A from a year prior.
  • Construction in Progress was $2.8 million for Q4 2020 at SWK Holdings.
  • In the past five years, Construction in Progress ranged from a high of $2.8 million in Q4 2020 to a low of $2.8 million in Q4 2020.