Powerbank (SUUN) Construction in Progress (2023 - 2025)
Powerbank (SUUN) has disclosed Construction in Progress for 3 consecutive years, with $22.8 million as the latest value for Q2 2025.
- Quarterly Construction in Progress rose 250.37% to $22.8 million in Q2 2025 from the year-ago period, while the trailing twelve-month figure was $22.8 million through Jun 2025, up 250.37% year-over-year, with the annual reading at $22.8 million for FY2025, 250.37% up from the prior year.
- Construction in Progress for Q2 2025 was $22.8 million at Powerbank, up from $6.5 million in the prior quarter.
- The five-year high for Construction in Progress was $22.8 million in Q2 2025, with the low at $823364.4 in Q2 2023.
- Average Construction in Progress over 3 years is $10.1 million, with a median of $6.5 million recorded in 2024.
- The sharpest move saw Construction in Progress soared 691.11% in 2024, then surged 250.37% in 2025.
- Over 3 years, Construction in Progress stood at $823364.4 in 2023, then skyrocketed by 691.11% to $6.5 million in 2024, then soared by 250.37% to $22.8 million in 2025.
- According to Business Quant data, Construction in Progress over the past three periods came in at $22.8 million, $6.5 million, and $823364.4 for Q2 2025, Q2 2024, and Q2 2023 respectively.