Powerbank (SUUN) Construction in Progress (2023 - 2025)
Powerbank (SUUN) has disclosed Construction in Progress for 2 consecutive years, with $6.5 million as the latest value for Q2 2024.
- On a quarterly basis, Construction in Progress rose 691.11% to $6.5 million in Q2 2024 year-over-year; TTM through Jun 2024 was $6.5 million, a 691.11% increase, with the full-year FY2024 number at $6.5 million, up 688.29% from a year prior.
- Construction in Progress was $6.5 million for Q2 2024 at Powerbank, up from $823364.4 in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $6.5 million in Q2 2024 to a low of $823364.4 in Q2 2023.