SunOpta (STKL) Construction in Progress (2021 - 2026)
SunOpta's Construction in Progress history spans 5 years, with the latest figure at $17.9 million for Q1 2026.
- For Q1 2026, Construction in Progress fell 3.76% year-over-year to $17.9 million; the TTM value through Jan 2026 reached $17.9 million, down 3.76%, while the annual FY2026 figure was $17.9 million, 3.76% down from the prior year.
- Construction in Progress reached $17.9 million in Q1 2026 per STKL's latest filing, down from $18.6 million in the prior quarter.
- In the past five years, Construction in Progress ranged from a high of $128.4 million in Q4 2022 to a low of $17.9 million in Q1 2026.
- Average Construction in Progress over 4 years is $49.4 million, with a median of $33.3 million recorded in 2023.
- Peak YoY movement for Construction in Progress: surged 163.66% in 2022, then crashed 74.07% in 2023.
- A 4-year view of Construction in Progress shows it stood at $128.4 million in 2022, then plummeted by 74.07% to $33.3 million in 2023, then tumbled by 44.14% to $18.6 million in 2024, then decreased by 3.76% to $17.9 million in 2026.
- Per Business Quant, the three most recent readings for STKL's Construction in Progress are $17.9 million (Q1 2026), $18.6 million (Q4 2024), and $33.3 million (Q4 2023).