Growth Metrics

SunOpta (STKL) Construction in Progress (2021 - 2024)

Historic Construction in Progress for SunOpta (STKL) over the last 4 years, with Q4 2024 value amounting to $18.6 million.

  • SunOpta's Construction in Progress fell 4414.41% to $18.6 million in Q4 2024 from the same period last year, while for Dec 2024 it was $18.6 million, marking a year-over-year decrease of 4414.41%. This contributed to the annual value of $18.6 million for FY2024, which is 4414.41% down from last year.
  • As of Q4 2024, SunOpta's Construction in Progress stood at $18.6 million, which was down 4414.41% from $33.3 million recorded in Q4 2023.
  • In the past 5 years, SunOpta's Construction in Progress ranged from a high of $128.4 million in Q4 2022 and a low of $18.6 million during Q4 2024
  • Moreover, its 4-year median value for Construction in Progress was $33.3 million (2023), whereas its average is $50.5 million.
  • In the last 5 years, SunOpta's Construction in Progress soared by 16365.5% in 2022 and then plummeted by 7406.54% in 2023.
  • SunOpta's Construction in Progress (Quarter) stood at $23.7 million in 2021, then soared by 441.77% to $128.4 million in 2022, then plummeted by 74.07% to $33.3 million in 2023, then crashed by 44.14% to $18.6 million in 2024.
  • Its Construction in Progress stands at $18.6 million for Q4 2024, versus $33.3 million for Q4 2023 and $128.4 million for Q4 2022.