Growth Metrics

Neuronetics (STIM) Capital Expenditures (2017 - 2026)

Neuronetics has reported Capital Expenditures over the past 10 years, most recently at $197000.0 for Q1 2026.

  • Quarterly Capital Expenditures fell 10.05% to $197000.0 in Q1 2026 from the year-ago period, while the trailing twelve-month figure was $779000.0 through Mar 2026, up 3440.91% year-over-year, with the annual reading at $801000.0 for FY2025, 6061.54% up from the prior year.
  • Capital Expenditures was $197000.0 for Q1 2026 at Neuronetics, down from $771000.0 in the prior quarter.
  • Over five years, Capital Expenditures peaked at $1.1 million in Q1 2022 and troughed at -$1.4 million in Q4 2024.
  • The 5-year median for Capital Expenditures is $252000.0 (2025), against an average of $265823.5.
  • Year-over-year, Capital Expenditures surged 766.21% in 2022 and then tumbled 1320.83% in 2024.
  • A 5-year view of Capital Expenditures shows it stood at $503000.0 in 2022, then crashed by 119.09% to -$96000.0 in 2023, then tumbled by 1320.83% to -$1.4 million in 2024, then soared by 156.52% to $771000.0 in 2025, then plummeted by 74.45% to $197000.0 in 2026.
  • Per Business Quant, the three most recent readings for STIM's Capital Expenditures are $197000.0 (Q1 2026), $771000.0 (Q4 2025), and -$441000.0 (Q3 2025).