Stratasys (SSYS) Construction in Progress: 2011-2024
Historic Construction in Progress for Stratasys (SSYS) over the last 9 years, with Dec 2024 value amounting to $4.7 million.
- Stratasys' Construction in Progress rose 95.88% to $4.7 million in Q4 2024 from the same period last year, while for Dec 2024 it was $4.7 million, marking a year-over-year increase of 95.88%. This contributed to the annual value of $4.7 million for FY2024, which is 95.88% up from last year.
- Per Stratasys' latest filing, its Construction in Progress stood at $4.7 million for FY2024, which was up 95.88% from $2.4 million recorded in FY2023.
- Stratasys' 5-year Construction in Progress high stood at $4.7 million for FY2024, and its period low was $888,000 during FY2020.
- Moreover, its 3-year median value for Construction in Progress was $3.0 million (2022), whereas its average is $3.4 million.
- As far as peak fluctuations go, Stratasys' Construction in Progress slumped by 31.80% in 2020, and later skyrocketed by 105.18% in 2021.
- Yearly analysis of 5 years shows Stratasys' Construction in Progress stood at $888,000 in 2020, then skyrocketed by 105.18% to $1.8 million in 2021, then spiked by 65.64% to $3.0 million in 2022, then declined by 21.17% to $2.4 million in 2023, then soared by 95.88% to $4.7 million in 2024.