Ssr Mining (SSRM) Construction in Progress (2016 - 2017)
Ssr Mining's Construction in Progress history spans 3 years, with the latest figure at $44.9 million for Q4 2018.
- For Q4 2018, Construction in Progress rose 1107.48% year-over-year to $44.9 million; the TTM value through Dec 2018 reached $44.9 million, up 1107.48%, while the annual FY2018 figure was $44.9 million, 1107.48% up from the prior year.
- Construction in Progress for Q4 2018 was $44.9 million at Ssr Mining, up from $3.7 million in the prior quarter.
- Across five years, Construction in Progress topped out at $44.9 million in Q4 2018 and bottomed at $1.8 million in Q4 2016.
- The 3-year median for Construction in Progress is $3.7 million (2017), against an average of $16.8 million.
- The largest annual shift saw Construction in Progress skyrocketed 102.67% in 2017 before it skyrocketed 1107.48% in 2018.
- A 3-year view of Construction in Progress shows it stood at $1.8 million in 2016, then surged by 102.67% to $3.7 million in 2017, then surged by 1107.48% to $44.9 million in 2018.
- Per Business Quant, the three most recent readings for SSRM's Construction in Progress are $44.9 million (Q4 2018), $3.7 million (Q4 2017), and $1.8 million (Q4 2016).