Ssr Mining (SSRGF) Construction in Progress (2016 - 2018)
Historic Construction in Progress for Ssr Mining (SSRGF) over the last 3 years, with Q4 2018 value amounting to $44.9 million.
- Ssr Mining's Construction in Progress rose 15918.99% to $44.9 million in Q4 2018 from the same period last year, while for Dec 2018 it was $44.9 million, marking a year-over-year increase of 15918.99%. This contributed to the annual value of $44.9 million for FY2018, which is 15918.99% up from last year.
- Per Ssr Mining's latest filing, its Construction in Progress stood at $44.9 million for Q4 2018, which was up 15918.99% from $17.3 million recorded in Q4 2017.
- Ssr Mining's Construction in Progress' 5-year high stood at $44.9 million during Q4 2018, with a 5-year trough of $6.1 million in Q4 2016.
- Moreover, its 3-year median value for Construction in Progress was $17.3 million (2017), whereas its average is $22.8 million.
- Its Construction in Progress has fluctuated over the past 5 years, first surged by 18311.79% in 2017, then skyrocketed by 15918.99% in 2018.
- Quarter analysis of 3 years shows Ssr Mining's Construction in Progress stood at $6.1 million in 2016, then soared by 183.12% to $17.3 million in 2017, then skyrocketed by 159.19% to $44.9 million in 2018.
- Its last three reported values are $44.9 million in Q4 2018, $17.3 million for Q4 2017, and $6.1 million during Q4 2016.