Growth Metrics

Equinox Gold (EQX) Construction in Progress (2019 - 2024)

Historic Construction in Progress for Equinox Gold (EQX) over the last 3 years, with Q4 2024 value amounting to $818.4 million.

  • Equinox Gold's Construction in Progress changed N/A to $818.4 million in Q4 2024 from the same period last year, while for Dec 2024 it was $818.4 million, marking a year-over-year change of. This contributed to the annual value of $818.4 million for FY2024, which is N/A changed from last year.
  • Latest data reveals that Equinox Gold reported Construction in Progress of $818.4 million as of Q4 2024.
  • Equinox Gold's 5-year Construction in Progress high stood at $818.4 million for Q4 2024, and its period low was $42000.0 during Q1 2020.