Equinox Gold (EQX) Construction in Progress (2024)

Equinox Gold has reported Construction in Progress over the past 1 years, most recently at $818.4 million for Q4 2024.

  • Quarterly results put Construction in Progress at $818.4 million for Q4 2024, changed N/A from a year ago — trailing twelve months through Dec 2024 was $818.4 million (changed N/A YoY), and the annual figure for FY2024 was $818.4 million, changed.
  • Construction in Progress for Q4 2024 was $818.4 million at Equinox Gold.
  • Over the last five years, Construction in Progress for EQX hit a ceiling of $818.4 million in Q4 2024 and a floor of $818.4 million in Q4 2024.